Former names
  
Cascadia Center

Construction started
  
2011

Floor count
  
6

Floors
  
6

Architecture firm
  
Miller Hull

Architect
  
Robert Hull

Type
  
Commercial offices

Completed
  
2012

Opened
  
22 April 2013

Cost
  
30 million USD

Owner
  
Bullitt Foundation

Bullitt Center wwwbullittcenterorgwpcontentthemesbullittcen

Location
  
1501 East Madison Street

Similar
  
McGilvra Place, The Crystal, Cirrus, Centre for Interactive Research, Westlake Park

Living proof building the bullitt center


The Bullitt Center is a commercial office building at the northern edge of the Central District neighborhood, near Capitol Hill, Seattle, Washington. It was officially opened on Earth Day, April 22, 2013. It is designed to be the greenest commercial building in the world when completed in 2012, qualifying for classification as a "Living Building" by the International Living Future Institute.

Contents

Map of Bullitt Center, 1501 E Madison St, Seattle, WA 98122, USA

It was built by the Bullitt Foundation, a non-profit group based in Seattle that focuses on urban ecology. The foundation will be a tenant, occupying half of one floor in the six story building, with additional commercial tenants occupying the rest of the building.

Construction costs for the six-story, 52,000-square-foot (4,800 m2) building were $18.5 million, or $355 per square foot. Including land, the cost is $30 million; for this price the building will provide "tenant ready" space (as opposed to the typical "cold dark shell" that most commercial spaces deliver).

The Bullitt Center is designed to have a 250-year lifespan. With construction begun in July 2011, the building is designed to be energy and carbon neutral, with a water and sewage processing system that allows the building to be independent of municipal water and sewage systems. Energy neutrality is achieved with a large solar panel array on the roof of the building along with energy conservation measures that will cut the building's energy consumption to approximately 1/3 of a typical office building of similar size. Although the building will be connected to the electricity grid and may at times draw more power than it produces (especially during the winter), at other times it should produce enough surplus to "repay" such withdrawals, yielding annual energy neutrality.

Considered to be at the current cutting edge of green construction, the structure requires a number of technical, legal, and social innovations to achieve a high level of ecological performance. The long term, 250 year design of the building created financing problems, as banks were unfamiliar with and thus hesitant to back such a project, because commercial buildings are typically financed based on an assumed 40-year lifespan. The 56,000-US-gallon (210,000 l) rainwater collection and UV light purification system has run into problems with local regulation, which require that water for consumption be chlorinated. The builders are negotiating with the regulatory agency for independent testing of the building's water system as a substitute, but will be connected to the municipal water supply as a back-up. The builders have negotiated with building material suppliers to ensure their products did not contain any of over 360 toxic chemicals; the supplier of the building sealant, for instance, agreed to remove phthalates from their product so that the building could use it. The structure also includes social design elements to reduce consumer energy use: the building may provide immediate feedback on energy use and publicize the energy consumption of each user.

Additional features include 26 geothermal wells that extend 400 feet (120 m) into the ground, where the temperature is a constant 55 °F (13 °C). These wells will help heat the building in the winter. All of the building's lumber is certified to standards set by the Forest Stewardship Council. and it is the first commercial building in the U.S. to earn FSC Project Certification. Also, the building has no parking spaces—only bike racks.

Seattle s bullitt center the world s greenest office building


References

Bullitt Center Wikipedia