Suvarna Garge (Editor)

Brienz–Rothorn railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Closed
  
1 August 1914

Electrification
  
None

Track gauge
  
800 mm (2 ft 7 ⁄2 in)

Brienz–Rothorn railway

Opened
  
17 June 1892, reopened 13 June 1931

Line length
  
7.6 kilometres (4.7 mi)

Number of tracks
  
single track with passing loops

Profiles

The Brienz–Rothorn railway (German: Brienz Rothorn Bahn, BRB) is a tourist rack railway in Switzerland, which climbs from Brienz, at the eastern end of Lake Brienz, to the summit of the Brienzer Rothorn mountain. The railway is 7.6 kilometres (4.7 mi) long, is built to 800 mm gauge (2 ft 7 12 in gauge), and uses the Abt double lamella rack system. Unusually for Switzerland, the line is not electrified, and most trains are operated by steam locomotives.

Contents

The Brienz–Rothorn railway reaches a height of 2,244 metres above sea level and is the fourth highest railway in Switzerland.

History

The railway was opened on 17 June 1892, after a two years construction period. The two designers, engineer Alexander Lindner and contractor Theo Bertschinger were supported by the mountain railway pioneer Roman Abt, who had responsibility for equipping the line with his newly developed Abt double lamella rack system.

The line connected at Brienz with the Brünig railway, which had been opened in 1888 from Brienz eastwards towards Lucerne. However the Brünig railway was not extended westward to Interlaken until 1916, so many early travelers to the Rothorn had to arrive by boat service on Lake Brienz.

The line was quickly in financial difficulties. The line was designed to carry 25,000 passengers per year but only managed 5,000 passengers in the first year. Tourist traffic was further affected by the opening of Schynige Platte Railway in 1895 and the Jungfraubahn in 1898. The train service was suspended on 1 August 1914 as a result of the First World War, but did not re-open when the war ended.

Essential maintenance was carried out and a small amount of timber traffic was carried from Planalp in 1918. Carriages were hired to the Schynige Platte Railway in 1924 and 1925, providing money for the maintenance work. The line was finally re-opened on 13 June 1931, the first train to reach the summit in 17 years having run 4 days earlier. The railway was in good condition because of the continuing maintenance.

Unlike other Swiss mountain lines, the BRB was not electrified and this made the railway a special attraction as from 1953 to 1990 it was the only steam-operated line in Switzerland. Although other Swiss mountain railways offer special "steam" trips this is the only line which offers a full steam service, the diesel locomotive only being used for additional trains and for light traffic periods.

Route

The BRB is 7.6 kilometres (4.7 mi) long with a maximum gradient of 1 in 4 (25%) and includes 5 tunnels. It begins in Brienz at 566 m (1,857 ft) above sea level, from a terminus opposite the Brienz station of the Zentralbahn railway company's Brünig line. Also nearby is the quay used by the BLS AG shipping services on Lake Brienz.

The railway is single track with three passing loops. The first passing loop is at Geldried, 1,019 m (3,343 ft) above sea level. The halfway passing loop of the line is at Planalp station at 1,341 m (4,400 ft) above sea level. The older steam locomotives stop to take water. The third passing loop is at Oberstafel, 1,819 m (5,968 ft) above sea level.

The upper terminus of the line is at Rothorn Kulm station at 2,244 m (7,362 ft) above sea level, a little below the summit of the mountain.

A popular hiking trail runs between the summit station, and the Brünig-Hasliberg station at the point where the Brünig line crosses the Brünig Pass.

Locomotives and Rolling Stock

All steam locomotives are Class H2/3, indicating that 2 axles of the 3 are driven, giving a wheel arrangement (Whyte System) of 0-4-2. The older locomotives are a side tank, "kneeling cow" design of a standard SLM product. The modern steam locomotives use an efficient "light oil" fired steam technology and were built by SLM (former Swiss Locomotive and Machine Works) of Winterthur.

A prototype diesel locomotive, class Hm2/2, number 8, was delivered in 1973 but sold to the Chemin de fer Montreux-Glion-Rochers-de-Naye in 1995 as their number 4. New diesel locomotives were constructed by Ferdinand Steck Maschinenfabrik and are of (Whyte System) 0-4-0 wheel arrangement to a "kneeling cow" design.

Timetable

Rothorn Kulm from June 4 until October 23, 2016 The Brienz Rothorn Railway operates 7 days per week from June 4 to October 23 2016 all the way up to the Rothorn. They try to ensure that all their services are steam powered.

Departures from Brienz Brienz BRB 07.30* 08.36 09.40 10.45 11.45 12.58 13.58 14.58 16.36 Planalp 07.56* 09.03 10.07 11.12 12.15 13.27 14.27 15.27 17.03 Rothorn 08.25* 09.31 10.35 11.43 12.45 13.57 14.57 15.57 17.31 Departures from Rothorn Kulm Rothorn 08.30* 09.38 11.15 12.20 13.28 14.28 15.28 16.28 17.40 Planalp 09.02* 10.10 11.50 12.58 14.02 15.02 16.02 17.02 18.12 Brienz BRB 09.30* 10.38 12.20 13.30 14.32 15.32 16.32 17.32 18.40

References

Brienz–Rothorn railway Wikipedia