Kalpana Kalpana (Editor)

Blyth Navigation

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Maximum boat length
  
50 ft 0 in (15.24 m)

Status
  
Abandoned

Length
  
11,265 m

Date of act
  
1757

End point
  
Southwold Harbour

Start point
  
Halesworth

Maximum boat beam
  
14 ft 0 in (4.27 m)

Principal engineer
  
Langley Edwards

Date closed
  
1911

Date of first use
  
1761

Locks
  
6

Blyth Navigation httpsuploadwikimediaorgwikipediacommonsthu

Original owner
  
Southwold Harbour Trustees

The Blyth Navigation was a canal in Suffolk, England, running 7 miles (11 km) from Halesworth to the North Sea at Southwold. It opened in 1761, and was insolvent by 1884. Its demise was accelerated by an attempt to reclaim saltings at Blythburgh, which resulted in the estuary silting up. It was used sporadically until 1911, and was not formally abandoned until 1934.

Contents

HistoryEdit

Between Southwold and Walberswick, the mouth of the River Blyth forms a tidal creek, which opens out into a large area of saltings below the first bridge over the river at Blythburgh. The river was navigable to the port of Blythburgh until the 16th century, but navigation was increasingly affected by silting up of the channel. The volume of water which drained from the saltings on every tide kept the mouth of the river scoured, and enabled Southwold to develop as an important, though minor, port.

The idea of making the river navigable beyond Blythburgh was proposed by Thomas Knights in the 1740s. Knights was a brewer from Halesworth, and suggested that Southwold harbour needed to be improved first. An Act of Parliament was obtained in 1746 to authorise the improvements, which were sufficiently successful that harbour dues more than doubled over the next five years. Knights tried to gain more support for a navigation to Halesworth, and a plan for the navigation, including a branch from Halesworth to Ubbeston was prepared by Benjamin Reeve in 1753. The project which included three locks was costed at £4,614 by John Reynolds in May 1753, but there was a delay before the bill was submitted to Parliament.

Following the granting of an Act of Parliament on 1 April 1757, which included additional powers for the Southwold Harbour trustees, a new survey was carried out by Langley Edwards, who estimated the cost at £3,000, which included the purchase of Wenhaston watermill. By 1759, subscriptions had been received from 38 people, mainly from the immediate locality, for a total of £3,600. Having made the estimate, Edwards was responsible for completing the work to that price, but failed to attend most of the meetings which the commissioners called. Despite his elusiveness, the work was completed at a cost of £3,822, and the official opening took place on 23 July 1761.

OperationEdit

As built, the navigation had four locks and a tidal staunch located just above Blythburgh bridge. From the sea, it followed the River Blyth until it reached the Town River, which it followed to Halesworth Lock. From there, the New Cut took the canal to a wharf at Halesworth, which formed the terminus of the canal. The New Cut joined back up with the Town River a little further to the west, in order to provide the water supply for the locks.

The locks were built to allow wherries to use the navigation, and so were 50 by 14 feet (15.2 by 4.3 m). However, they were unusual, in that the side walls curved outwards in the centre, to provide an extra 1.5 feet (0.46 m) of width. So that wherries could reach his maltings, a local maltster named Patrick Stead increased the water levels above the point where the New Cut and the Town River joined, by building an additional lock near the junction.

The day-to-day running of the navigation for the first four years was the responsibility of Samuel Jones, who appears to have overseen the construction of the navigation while Langley Edwards was elsewhere, and who was appointed as lock-keeper, toll-collector, warehouse-keeper and surveyor of works by the Commissioners. Each time his contract was to be renewed, they attempted to reduce his salary, and so he left and was replaced by his assistant William Bickers. Tolls over the next thirty years averaged £134 per year

DemiseEdit

In the early 19th century, the saltings below Blythburgh bridge were reclaimed by the construction of embankments, to prevent them flooding. The plan was poorly thought out, and soon afterwards the condition of Southwold harbour was deteriorating, largely due to the deposition of silt, which made access difficult. The canal engineer John Rennie was asked to advise on a course of action, but although his report of 6 January 1820 pointed to the embanking of the saltings as the cause of the problem, he could offer no acceptable solution. The entrance to the harbour became blocked in 1839, and a further report was prepared by John Wright and James Walker in 1840. They calculated that the embankments surrounding the saltings excluded 5.5 million cubic yards (4.2 million m3) of tidal water on each tide, and thus the scouring effect of the river was considerably reduced.

1879 saw the opening of the Southwold Railway, a narrow gauge line between Southwold and Halesworth, which crossed the navigation near Southwold on a swing bridge. Although lack of capital prevented the construction of a branch from the main line to the navigation at Halesworth and another along the north bank of the river towards Southwold harbour, the railway still had an effect on the navigation, use of which declined until the Commissioners advertised that they were no longer deriving any income from it in 1884, and would therefore cease to maintain it. In 1894 the Commissioners voted to ask the Board of Trade for a warrant to allow the navigation to be abandoned. Despite this, a trader from Halesworth called Fred Lambert brought a wherry called Star to the river, and carried coal from the harbour at Southwold to Halesworth until 1911. He estimated that the cost of repairing the navigation was £1,000, but he could not raise the money to carry out the work.

The Southwold Railway finally built a branch to the harbour in 1914, as part of a plan to relieve congestion of the harbours at Great Yarmouth and Lowestoft during the herring fishing season. The outbreak of war prevented its use for this purpose, although it was useful when coastal defences were being built in the area. The harbour declined until it was sold back to the Southwold Corporation in 1932, while the navigation finally ceased on 19 February 1934, when an act of abandonment was obtained under section 41 of the Land Drainage Act 1930.

RemainsEdit

The swing bridge which carried the railway over the river was widened in 1907, and was removed at the outbreak of World War II. It has since been replaced by a fixed Bailey Bridge to provide access on foot to Walberswick. With the demise of the locks, the river levels have fallen, so that it is difficult to imagine that wherries once reached Halesworth. The embankments enclosing the saltings below Blythburgh have been breached, and once more a large inland lake forms when the tide is high. Southwold harbour is used for moorings, and can accommodate 110 boats, while navigation is still possible to Blythburgh, although the Bailey bridge restricts access to smaller boats.

There have been sporadic efforts to restore the canal for navigation, but the resultant flooding of bordering land has made this unpopular. On 27 May 2016, Gerald Burns canoed from Halesworth to Southwold, carrying a sack of malt in his boat, which he delivered to Adnams Brewery in Southwold. The purpose of the journey was to raise funds for the restoration of New Reach at Halesworth, which played an important part in the industrial history of the town.

References

Blyth Navigation Wikipedia