Neha Patil (Editor)

Blue Mountain Faulkner 1 Geothermal Power Plant

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Commission date
  
October 2009

Make and model
  
Ormat Technologies

Status
  
Operational

Type
  
Binary cycle

Construction cost
  
180 million USD


Location
  
Humboldt County, Nevada

Operator(s)
  
Nevada Geothermal Power

Blue Mountain Faulkner 1 Geothermal Power Plant is a geothermal power plant located in Humboldt County, Nevada, United States. It is owned and operated by Nevada Geothermal Power Inc. Produced electricity is sold to NV Energy through a 21-mile (34 km) 120-kV transmission line to the transmission grid connection at Mill City, Nevada.

The plant was completed in October 2009. It has installed capacity of 50 megawatts (67,000 hp). As of November 2010, the plant operated at a net output of 37 megawatts (50,000 hp). It is a binary cycle geothermal plant, which uses a closed-loop heat exchange system. In this system hot geothermal water with an average temperature of 302 °F (150 °C) heats a secondary fluid, isobutane, which is vaporized and used to run a turbine. The geothermal water is supplied by five production wells and injected by six injection wells. There is program to add three new production wells. The depth of wells is 4,000–8,000 feet (1,200–2,400 m).

The technology was supplied by Ormat Technologies. The well drilling contractors were ThermaSource and Ensign. The piping contractor was JFMPE and the reservoir engineering was handled by GeoThermEx Inc. The plant cost US$180 million, of which $57.9 million was funded under the American Reinvestment and Recovery Act.

References

Blue Mountain Faulkner 1 Geothermal Power Plant Wikipedia