Opened
  
1976

Line length
  
476 km (296 mi)

Electrification
  
25 kV, 50 Hz AC

Operator(s)
  
Serbian Railways, ŽPCG

Number of tracks
  
1

Belgrade–Bar railway blondegypsycomwpcontentuploads201407Train

Track gauge
  
1,435 mm (4 ft 8 ⁄2 in)

Owners
  
Serbian Railways, Rail transport in Montenegro

Terminis
  
Bar Rail Station, Belgrade Main railway station

The Belgrade–Bar railway (Serbian: Пруга Београд–Бар or Pruga Beograd–Bar) is a railway connecting the Serbian capital of Belgrade with the town of Bar, a major seaport in Montenegro.

Contents

Overview

Belgrade–Bar railway Belgrade to Bar Train EricampTaylorcom

The Belgrade–Bar railway is a standard gauge railway, 476 km (296 mi) long. Of this length, 301 km (187 mi) of the railway goes through Serbia, and 175 km (109 mi) through Montenegro. It is electrified along the entire corridor (25 kV, 50 Hz AC). It passes through 254 tunnels of total length of 114,435 m (375,443 ft) and over 435 bridges (total length 14,593 m (47,877 ft)). The longest tunnels are "Sozina" 6.17 km (4 mi) and "Zlatibor" 6.139 km (4 mi). The biggest and the best known bridge is Mala Rijeka viaduct, 498 m (1,634 ft) long and 198 m (650 ft) above ground level.

Belgrade–Bar railway Bar Montenegro for The Amazing BelgradeBar Railway Jrrny

The highest point of the railway is at 1,032 m (3,386 ft) AMSL, at the town of Kolašin. The railway descends to 40m AMSL at Podgorica in a relatively short distance, thus the gradient of 25‰ on this section.

Belgrade–Bar railway FileBelgradeBar railwayjpg Wikimedia Commons

A small 9 km (6 mi) section of the railway actually passes through Bosnia and Herzegovina, near the town of Štrpci, but the trains do not stop there.

Belgrade–Bar railway FileFrom BelgradeBar trainjpg Wikimedia Commons

When built, it took a train approximately seven hours to complete the trip from Belgrade to Bar. Today it takes 11 hours, due to speed restrictions, as the railway cannot safely sustain the projected speeds without being thoroughly rebuilt.

History

Belgrade–Bar railway Night trains PragueBar EC273341431 railcc

The decision to build the railway connection between Belgrade and Bar was made in 1952, as a national project of the SFRY. However, the construction was passed to the constituent Republics, SR Serbia and SR Montenegro, to build on their own.

The sections of the railway were completed as follows:

  • Resnik – Vreoci in 1958
  • Podgorica – Bar in 1959
  • Vreoci – Valjevo in 1968
  • Valjevo – Užice in 1972
  • Užice – Podgorica in 1976
  • The construction works were concluded on 27 November 1975, by joining the railway tracks south of Kolašin.The railway was opened on 28. May 1976. Electrification was completed at the end of 1977.

    Maintenance of the Belgrade–Bar railway suffered from chronic underfunding during the 1990s, which has resulted in the railway deteriorating and becoming unsafe. This culminated in the Bioče derailment, when a passenger train derailed, causing the deaths of 47 passengers. As a result, efforts are being made to thoroughly reconstruct the railway.

    The Serbian part of the railway was targeted several times by NATO during its bombing campaign in 1999, seriously damaging portions of the railway. Also the small section that passes through Bosnia and Herzegovina was blown up by SFOR ground forces. All of this damage was later repaired.

    In 2016 Serbia commenced a thorough reconstruction of the entire section on its territory. The aim is to make the line able to support the maximum speed of 120 km/h as was in the original project. The first section, from Belgrade to Valjevo, which represents 27% of the Serbian part of the line is due for completion during the summer of 2017.

    References

    Belgrade–Bar railway Wikipedia