Puneet Varma (Editor)

Barcelona Metro line 10

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Barcelona Metro line 10 httpsuploadwikimediaorgwikipediacommonsthu

Line 10 (Zona Franca ZAL - Gorg) is the name of one of the two branches of the Barcelona metro extension line 9, currently under construction and to be operated by TMB. Like Line 9 and Line 11, it will be an automatic train operation (i.e. driverless vehicle) metro line.

Contents

Overview

It links the Zona Franca with Badalona, through Barcelona proper, sharing most of the area covered by L9. L9/10 will be the deepest and longest line in the network. Originally expected to be ready by 2008, ongoing problems with its construction are going to delay its completion until as late as 2013.

The section from Gorg to Bon Pastor opened on 18 April 2010, and the section from La Sagrera to Bon Pastor (except Estació de la Sagrera station) opened 26 June 2010.

List of stations

(Stations under construction in italics)

Zona Franca area

  • Polígon Pratenc
  • Zona Franca-ZAL
  • Zona Franca-Ecoparc
  • Zona Franca-Port Nou
  • Zona Franca-Sector A
  • Motors
  • Foc Cisell (L2)
  • Foneria
  • Ildefons Cerdà (L8)
  • Provençana
  • Central branch, shared with L9

  • Can Tries-Gornal
  • Torrassa (L1, RENFE)
  • Collblanc (L5)
  • Camp Nou (T1, T2, T3)
  • Zona Universitària (L3)
  • Campus Nord
  • Manuel Girona
  • Prat de la Riba
  • Sarrià (L6, L12)
  • Mandri
  • El Putxet (L7)
  • Lesseps (L3)
  • Muntanya
  • Sanllehy
  • Guinardó (L4)
  • Maragall
  • Provisional L10 Start

  • La Sagrera (L1, L4, RENFE)
  • Sagrera-TAV (L4, RENFE-AVE)
  • Onze de Setembre
  • Bon Pastor
  • Besòs area

  • Llefià
  • La Salut
  • Gorg (L2, T5, T6)
  • Provisional L10 End

    References

    Barcelona Metro line 10 Wikipedia