Balimela Reservoir

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Official name
  
ବାଲିମେଳା ବନ୍ଧ

Purpose
  
Irrigation, Power

Opening date
  
1988

Catchment area
  
4,910 km²

Owner
  
Location
  
Status
  
Completed

Operator(s)
  
Surface area
  
184.5 km²

Impound
  
Balimela Reservoir staticpanoramiocomphotosmedium39368112jpg

Preaching gospel india balimela reservoir odisha


The Balimela Reservoir is located in Malkangiri district, Odisha, India on the river Sileru which is a tributary of the Godavari river. The gross storage capacity of Balimela reservoir is 3610 million cubic meters.

Contents

Map of Balimela Reservoir

Andhra Pradesh (AP) and Odisha states entered into agreements to construct Balimela dam as a joint project and share the Sileru river waters available equally at Balimela dam site. Odisha developed the 360 MW (6 × 60 MW units) power house by diverting the Balimela waters to the Potteru sub-river basin. A barrage at Surlikonda across the Potteru stream was constructed to redirect the discharge from Balimela Power House into two main canals for irrigation; one on the right side named Tamasha Main Canal and the second on the left side named Gompakonda Main Canal. These two canals were constructed under the Potteru Irrigation Project for irrigation in Malkangiri district, the most backward district of the state and thereby lifting the living standard of the inhabitants. Two more power generation units 75 MW each were added under stage-2 to increase the installed capacity up to 510 MW.

The share of Andhra Pradesh from the available water in the Belimela is released downstream into the river for generating hydro electricity located at Upper Sileru, Donkarai and lower Sileru Hydro power stations ultimately utilizing the water for irrigation in the Godavari delta during dry season.

Balimela reservoir top 5 facts


Interstate disputeEdit

Odisha is not permitting AP to install hydropower units (30 MW capacity) at the toe of Balimela dam on the grounds of another jurisdiction. Though AP is permitted in the agreements, Odisha says the site of power house is located in Odisha's territory and AP cannot install the hydro power units in its land. Thus 30 MW power generation capacity at a very low generation cost can not be developed for the last 40 years due to the dispute. The agreement also states that Kolab river surplus water available in Upper Kolab reservoir can be diverted jointly by Odisha and AP to Sileru/Machkund river basin for enhancing hydro power potential substantially. This diversion scheme has also not materialized until now.