Trisha Shetty (Editor)

Badarpur railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Elevation
  
23 m (75 ft)

Tracks
  
5

Owner
  
Indian Railways

Owned by
  
Indian Railways

Opened
  
1898

Platforms in use
  
3

Badarpur railway station

Location
  
Barak valley, Badarpur, Karimganj District, Assam  India

Operated by
  
North East Frontier Railway

Line(s)
  
Lumding-Badarpur section

Address
  
Badarpur Rly Town, Assam 788806

Similar
  
Lumding Junction railway st, Agartala railway station, Silchar railway station, Patharkandi railway station, Arunachal Junction railway st

Disaster in badarpur railway station assam


Badarpur railway station belongs to Lumding railway division of North East Frontier Railway. It is located at Karimganj District in the state of Assam.

Contents

The first time bg trial engine arrived at badarpur railway station


History

Assam Bengal Railway was incorporated in 1892 to serve British-owned tea plantations in Assam. The railway line from Chittagong to Badarpur was opened to traffic in 1898. In 1942 the management of Assam Bengal Railway was transferred to the Govt of India. It was amalgamated with the state managed Eastern Bengal Railway and designated as Bengal Assam Railway .

On 1 January 1942 the Assam Bengal Railway combined with the Eastern Bengal Railway to form the Bengal and Assam Railway. At time of the independence of India in 1947, Bengal-Assam Railway was split up and the portion of the system, about 2,603.92 km long which fell within the boundary of erstwhile East Pakistan was named as Eastern Bengal Railway, the control remaining with the central Government of Pakistan. Later, with the effect from 1 February 1961, Eastern Bengal Railway was renamed as Pakistan Railway.

Successors

With the partition of India in 1947, portions of the Bengal Assam Railway which lay in Assam and the Indian part of North Bengal became Assam Railway. North Eastern Railway was formed in 1952 by amalgamating Assam Railway with Oudh Tirhut Railway and Fatehgarh district of Bombay, Baroda and Central India Railway. Northeast Fronter Railway was carved out of North Eastern Railway in 1958.

The portion of the system which fell within the boundary of erstwhile East Pakistan was named as Eastern Bengal Railway. On 1 February 1961, Eastern Bengal Railway was renamed as Pakistan Railway and in 1962 it became Pakistan Eastern Railway . With the emergence of Bangladesh, it became Bangladesh Railway.

After the independence of Pakistan on 15 August 1947 the broad-gauge portion of the Bengal-Assam Railway, lying in India was added to the East Indian Railway and the metre-gauge portion became the Assam Railway, with its headquarters at Pandu. On 14 April 1952, the 2857 km long Assam Railway and the Oudh and Tirhut Railway were amalgamated to form one of the six newly carved zones of the Indian Railways: the North Eastern Railway (India). On the same day, the reorganized Sealdah division of the erstwhile Bengal Assam Railway (which was added to the East Indian Railway earlier) was amalgamated with the Eastern Railway.

Project Unigauge

As announced by the Government of India for Gauge conversion of Lumding-Badarpur-Silchar-Jiribham and Badarpur-Kumarghat lines. Initial construction on these sections started in December 2009. Later Lumding-Badarpur section was closed to traffic for 18 months from 1 October 2014. It was expected to be opened for traffic in April 2015.

References

Badarpur railway station Wikipedia