Ascutney Mill Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
Windsor, Vermont

Impounds
  
Mill Brook

Length
  
250 ft (76 m)

Area
  
2 ha

Construction began
  
June 1834

Opening date
  
November 1834

Height
  
40 ft (12 m)

Opened
  
1783

Added to NRHP
  
9 January 2007

Ascutney Mill Dam httpsuploadwikimediaorgwikipediacommonsthu

Operator(s)
  
Ascutney Mill Dam Company

Similar
  
Cornish–Windsor Covered Bridge, Great Smoky Mountains, Shelburne Farms, Great Smoky Mountain, American Precision Museum

Ascutney Mill Dam, also known as the Windsor Upper Dam and the Mill Pond Dam, is an arch-gravity dam which is one of the oldest and among the earliest storage dams in the United States. It is made of cut granite and is located in Windsor, Vermont in Windsor County near the Connecticut River where it functioned as a source of hydropower and later, hydroelectric power. It is on the ASCE list of historic civil engineering landmarks since 1970 and is listed on the National Register of Historic Places (as Ascutney Mill Dam Historic District) since January 09, 2007.

Contents

Map of Ascutney Mill Dam, Windsor, VT 05089, USA

The dam is built in the valley of the Mill Brook, a right tributary of the Connecticut River. The pond above the dam is known as the Mill Pond.

The Ascutney Mill Dam Company was formed to build the dam. Construction began in June 1834 and was finished in November. The purpose of the dam was to regulate seasonal water flow and provide hydropower for nearby sawmills and gristmills, which previously could not operate during periods of low water flow in Mill Brook. The dam allowed water to be stored in the impound during the winter for release during lower flow seasons.

Ithamar A. Beard was a New England engineer who surveyed the area and selected the site for the dam. Simeon Cobb and Joseph Mason were the contractors in charge of building the dam.

History and PlanningEdit

As early as 1767 several sawmills and gristmills were operating along the banks of Mill Brook in Windsor, however, during periods of low water flow the mills stood idle. Like many early towns their location was often selected on the availability of such a resource. Water-powered mills to save human labor have been used since ancient times, but like all renewable energy resources, their power is not always available when needed. Sawmills were important facilities which cut logs into boards for construction, as were gristmills, which ground grain into flour. In post-colonial Vermont, these mills were essential for building and food supply needs of the growing cities.

The Ascutney Mill Dam Company was formed in 1833 to build the dam; it was the owner and was responsible for the dam's maintenance and operation. Despite problems during the financial panic of 1837, the company continued to operate the dam throughout the 19th century. Ithamar A. Beard was the engineer who surveyed the area and made the suggestion for the dam site.

Construction of the dam was performed from mid-April 1834 to mid-November 1834. It was built of cut granite and was one of the first [gravity-arch dams] built in the United States. It is also possibly the oldest masonry dam in the U.S. of any significant size. The original dam had a near-vertical downstream face built in an arch form.

Water filled up behind the dam each winter and was allowed to flow over the spillway the following spring. Water and ice falling over the crest and 40 feet (12 m) to the ledge below caused noise and vibrations throughout the village which concerned citizens. Inspections found that the vibrations caused no damage to the dam, but a stone buttress was built below the dam to stop the vibrations.

ConstructionEdit

Construction began in April 1834. Simeon Cobb and Joseph Mason were the contractors in charge of building the dam, and Allen Wardner, a prominent Windsor businessman and banker, superintending the work. The first step was to remove a small dam on the site. In June the first granite blocks were placed. The granite was obtained from nearby quarries. The overall construction was fairly simple and finished on November 1834, just seven months after construction began. The finished product was a 12.2 m (40.0 ft) high and 76.25 m (250.2 ft) long dam. The elevation above Mean Sea Level is 115 m (377 ft).

ConditionEdit

The National Program for Inspection of Non-Federal Dams performed an inspection of the dam in September 1978. The report was a Phase I inspection report. The author came from the Corps of engineers in Waltham, MA New England division. The abstract of the report writes:

"The dam is considered to be in fair condition. The dam is believed to be safe under normal operating conditions. The test flood is the PMF. It is recommended that the owner engage the services of a qualified consultant to evaluate the stability of the dam. In addition to long term recommendations, there are several remedial measures which should be implemented."

The current policy of the state of Vermont department of environmental conservation requires that only dams that are capable of impounding more than 500,000 cubic feet (14,000 m3) need to be inspected, which is not the case for the Upper Windsor Dam.

In the twentieth century, a concrete coping was placed on top of the structure to help ensure its stability in times of flood. The dam retains much of its original structural even though it is one of the oldest dams in the United States.

Topographic InformationEdit

For the United States Geological Survey (USGS), the dam is sourced in the Windsor Windsor quad. The topographic map shows the mountainous terrain of the area. In fact, Windsor County, Vermont is home to a total of 202 mountain summits and peaks. The highest is Gillespie Peak which is at an elevation of 3,343 feet (1,018.95 m) above sea level. The peak flow in the rivers near uneven terrain could fluctuate vastly between periods of high and low precipitation because much of the rainfall flowing down to a discharge rather than infiltrating into the ground first as it would in flat terrain. This flow could cause a large increase in flow rate and river height in a fairly small amount of time. The fact that the Connecticut River was just a few miles away also played a role in this. Because of all this, the timing of opening and closing the dam to regulate flow and produce hydroelectric power was important.

FishingEdit

The Windsor Upper Dam area is a popular fishing spot, just like many of the nearby locations. Fisherman could catch a variety of fish including bluegill, brook trout and rock bass. There are areas for both fly fishing and baitcasting. Either way, the chances for catching a fish are high.

Fishing here is open to the public but a Vermont fishing license is required. The type of license depends on what kind of fishing you are doing.