Status Under construction Roof 136 m (446 ft) Height 136 m Cost 3.5 billion PHP | Type Office Floor count 32 Floors 32 Estimated completion 2017 | |
![]() | ||
Floor area 62,000 m (670,000 sq ft) Architecture firm Skid, Owings & Merrill Similar One World Place, Clipp Center, The Infinity Fort Bonifacio, Shangri‑La at the Fort - Manila, One McKinley Place |
The ArthaLand Century Pacific Tower is a 32-storey office building under construction in Bonifacio Global City in Taguig, Metro Manila, Philippines. The construction cost of the building owned by Arthaland Corporation is around ₱3.5 billion and is slated to be completed by 2017.
Contents
- Map of Arthaland Tower 5th Ave Taguig Metro Manila Philippines
- Design and Features
- Reception
- References
Map of Arthaland Tower, 5th Ave, Taguig, Metro Manila, Philippines
Design and Features
The ArthaLand Tower will have 21 office floors, 14 elevators, and high-end retail outlets and other retail establishments at the ground floor and podium. It is Philippine Economic Zone Authority accredited and is aiming for LEED (Leadership in Energy and Environment Design Program) Gold and BERDE (Building for Ecologically Responsive Design Excellence) certification.
The office building was designed by Skidmore, Owings & Merrill (SOM) of New York, architect of One World Trade Center in New York City. This building is designed in collaboration with Filipino architectural firm, GF & Partners Architects Co.
It building will have 28,000 sqm. of net leasable area out of a gross floor area of 34,000sqm.
Reception
The building received the Best Green Development and Highly Commended in the Best Office Architectural Design at the Philippines Property Awards 2016. At the South East Asia Property Awards 2016, the ArthaLand Tower was conferred with the Special Recognition in Sustainable Design.