Crosses Aruvi Aru Total length 258 m Construction cost 540 million LKR | Opened 16 October 2011 Width 7.35 m Body of water Malvathu River | |
![]() | ||
Carries Motor vehicles on the B403 highway Inaugurated October 16, 2011 (2011-10-16) Similar St Sebastian's Cathedral, Doric Bungalow, Ketheeswaram temple, Arippu fort |
Arippu Bridge (also known as the Thallady-Arippu Bridge) is a road bridge across Aruvi Aru (Malvathu Oya) in north western Sri Lanka. The bridge was formally opened on 16 October 2011.
The bridge is 258 m (846 ft) long and 7.35 m (24 ft) wide. The bridge cost 540 million rupees (US$4.9 million) and was financed by a soft loan from the British Government's Steel Bridge Programme. The bridge is part of the B403 South Coast Road which connects Mannar with Puttalam.
References
Arippu Bridge Wikipedia(Text) CC BY-SA