Suvarna Garge (Editor)

Ampress Works Halt railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Lymington

Grid reference
  
SZ316969

Area
  
New Forest

Platforms in use
  
1

Ampress Works Halt railway station httpsuploadwikimediaorgwikipediacommonsthu

Original company
  
Southern Region of British Railways

1 October 1956
  
Station opened as Ampress Works Halt

By September 1970
  
Station renamed Ampress

Similar
  
Farringdon Halt railway st, Durley Halt railway station, Knowle Halt railway st, Kingsley Halt railway st, King's Worthy railway st

Ampress Works Halt was a halt station on the Lymington Branch Line which, between 1956 and 1989, served the Wellworthy engineering works near Lymington in Hampshire, England. Sited near the bridge over the A337 Lymington to Brockenhurst road, the station closed when the engineering works ceased operation. The station never appeared in any public timetable.

Contents

History

Opened by the Southern Region of British Railways in 1956, the station was served by Network SouthEast from the introduction of sectorisation until its closure. It was situated approximately 1 mile (1.6 km) from Lymington Town station near a bridge over the A337, and it was primarily intended for workers at the nearby Wellworthy factory. Constructed of concrete with chain-link fencing, it never appeared in any timetables and its demise came with the closure of the Wellworthy factory in 1989.

The site today

Trains on the electrified Lymington branch line still pass the site. However, as of June 2006 the new Lymington Hospital is being built on part of the old Wellworthy site, and the town of Lymington has also grown northwards to surround the location. The idea of reopening the halt, which still physically exists, has been discussed.

The station's former sign now hangs on the wall of the train shed at Eastleigh Lakeside Railway at the Lakeside Country Park.

References

Ampress Works Halt railway station Wikipedia