Commission date
  
1981

Average generation
  
1.1 TWh

Nameplate capacity
  
576 MW

Units operational
  
4930

Altamont Pass Wind Farm Altamount Pass Wind Farm

Location
  
Altamont Pass, Alameda County, California

Altamont pass wind farm i580


The Altamont Pass Wind Farm is located in the Altamont Pass of the Diablo Range in Northern California. It is one of the earliest wind farms in the United States. The first wind turbines were placed on the Altamont by Fayette Manufacturing Corporation on land owned by cattle rancher Joe Jess. The wind farm is composed of 4930 relatively small wind turbines of various types, making it at one time the largest wind farm in the world in terms of capacity. Altamont Pass is still the largest concentration of wind turbines in the world, with a capacity of 576 megawatts (MW), producing about 125 MW on average and 1.1 terawatt-hours (TWh) yearly. They were installed after the 1970s energy crisis in response to favorable tax policies for investors.

Contents

Altamont Pass Wind Farm httpsuploadwikimediaorgwikipediacommonsaa

Altamont pass wind farm in northern california


Environmental effects

Altamont Pass Wind Farm FileAltamont Pass Wind Farm 2758342791jpg Wikimedia Commons

The small turbines used at Altamont are dangerous to various raptors that hunt California Ground Squirrels in the area. 1300 raptors are killed annually, among them 70 golden eagles, which are federally protected; in total, 4700 birds are killed annually. Overall there has been an 80% decline in golden eagles in Northern California, with no golden eagles nesting near the facility, although it is a prime habitat. Considered largely obsolete, these numerous small turbines are being gradually replaced with much larger and more cost-effective units. The larger units turn more slowly and, being elevated higher, are claimed to be less hazardous to the local wildlife. This claim is supported by a report done for the Bonneville Power Administration.

Altamont Pass Wind Farm Gigaom Google to buy wind power from Bay Area39s Altamont Pass

As of 2010, a settlement has been reached between the Audubon Society, Californians for Renewable Energy and NextEra Energy Resources (who operate some 5,000 turbines in the area). Nearly half of the smaller turbines will be replaced by newer, more bird-friendly models. The project was expected to be complete by 2015 and included $2.5 million for raptor habitat restoration.

Repowering

Altamont Pass Wind Farm Altamont Pass Wind Farm USA and Canada

In 2015, NextEra, which owns some of the 100kw Kenetech/US Windpower older turbines, installed during the 1980s, agreed to remove the machines and replace them with 48 new model wind turbines. A power purchase agreement has been completed to power the Googleplex office complex in nearby Mountain View, California. The process of removing old wind turbines and replacing them with newer machines is called repowering.

Altamont Pass Wind Farm FileAltamont Pass Wind Farm 2759176158jpg Wikimedia Commons

A portion of the wind energy center is being dismantled as of 2016. Altamont Winds Inc (AWI)'s 83MW of 100kW Kenetech turbines are being taken down. These are older models with lattice towers. It has been proposed to replace them with 27 turbines with rated capacity of 2.1MW.