Country Romania Status Under construction Construction cost 300 million EUR | Location Casimcea Units operational 77 x 2,3-3 MW | |
Commission date 2012 (100 MW), 2013 (100 MW), 2014 (80 MW) Owner(s) Alpha Wind
CAS Regenerabile |
The Wind Farm Casimcea is an under construction wind power project in Tulcea County, Romania. It will consist of an individual wind farm with 77 individual wind turbines with a nominal output of around 2,3-3 MW which will deliver up to 688 000 000 kWh of power, enough to power over 445,000 homes, with a capital investment required of approximately €300 million.
References
Alpha Wind Casimcea Wind Farm Wikipedia(Text) CC BY-SA