Almaty Arena

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
Almaty, Kazakhstan

Field size
  
9.96 ha (99,600 m)

Built
  
2014–2016

Opened
  
18 September 2016

Owner
  
Almaty

Operator
  
City of Almaty

Broke ground
  
20 June 2014

General contractor
  
Bazis A

Capacity
  
12,000

Construction cost
  
170 million USD

Similar
  
Baluan Sholak Sports Pa, Medeu, Central State Museum, Almaty Tower, Ascension Cathedral - Almaty


Almaty Arena is a multi-purpose indoor arena located in Almaty, Kazakhstan. Arena was opened in 18 September 2016 and seat 12,000 spectators for ice hockey. Apart from hosting ice hockey matches, the arena is venue for boxing, figure skating, basketball, concerts, and other events. It is one of the venues to host the 2017 Winter Universiade. The arena is located in the north of punched Ryskulov Avenue, to the west from Momyshuly street in the Alatau District.

Contents

Almaty arena 28th winter universiade almaty kazakhstan


History

Almaty's successful bid to host the 2017 Winter Universiade, coupled with its bid to host the 2022 Winter Olympics, drove the need to build an ice hockey arena meeting the standards of the International Ice Hockey Federation (IIHF). On 27 March 2014, the city's mayor Akhmetzhan Yessimov announced the building of the new arena for 12,000 spectators and a minor arena for 3,000. The arenas were projected to cost $170 million and $89 million respectively.

Structure and facilities

The Ice palace will be the second largest in the CIS with the area of 9.96 ha (1,072,000 sq ft), similar with the Minsk-Arena and smaller than the Bolshoy Ice Dome. The complex will consist of three units: the ice arena with 12,000 seats, a training rink with a recreation complex, and a swimming pool. The layout of the ice arena will allow it to function as a universal platform for figure skating, ice hockey, boxing, basketball, volleyball, as well as a concert hall with 5,000 seats, in the case of laying thermal insulation covering the entire area of the ice field with about 1,800 m2 (19,000 sq ft). Special attention is given to the technology of ice freezing. 120 cubic meters of water is needed for each rink pouring. The water is pre-treated from various mechanical impurities, iron, chlorine and the salts, and then falls into the softener system and maintain the desired storage temperature. Ice surface is aligned with special ice machines to achieve the desired thickness - 5 cm after a complete freezing.