Puneet Varma (Editor)

Abbey line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Heavy rail

Status
  
Operational

Stations
  
7

Rolling stock
  
British Rail Class 319

System
  
National Rail

Locale
  
Hertfordshire

Opened
  
5 May 1858

Owner
  
Network Rail

Abbey line i36servimgcomuf3618063020abbey10jpg

Terminis
  
St Albans Abbey railway station, Watford Junction railway station

St albans abbey line last 321 first 319 goodbye 321413 415 hey 319216 20th september 2015


The Abbey line, also called the St Albans Abbey branch line, is a railway line from Watford Junction to St Albans Abbey. The 6.5-mile (10.5 km) route passes through town and countryside in the county of Hertfordshire, just outside the boundaries of the Oyster Card and London fare zones. Its northern terminus in St Albans Abbey is located in the south of the city, around 1.2 kilometres (0.75 mi) away from the larger St Albans City railway station on the Thameslink line.

Contents

The Abbey line is a semi-rural line and, due to its single-track operation, service frequencies are limited. The service is sometimes referred to locally as the Abbey Flyer.

Abbey line


History

The line was opened by the London and North Western Railway (LNWR) on 5 May 1858 and was the first railway to reach St Albans.

Originally there were two intermediate stations:

  • Bricket Wood
  • Park Street
  • In 1910 a station at Callowland opened, now Watford North.

    In 1924 the terminus at St Albans became St Albans Abbey to distinguish it from the Midland Railway main line station at St Albans City, which opened in 1868. The LNWR station was also served by a branch of the Great Northern Railway from Hatfield.

    A sixth station was added at Garston in 1966 and a seventh at How Wood in 1988, to coincide with the electrification of the route at 25 kV AC overhead.

    Past connections

    The line was built in its current form: a branch from Watford to St. Albans. However, the line was at times connected to two other lines. One, the Hatfield and St Albans Railway, opened in 1865 from St. Albans Abbey station to the East Coast main line at Hatfield. Mostly a local route, the construction of the Midland main line ensured that it never became popular with the critical market of passengers to London. It closed to passengers in 1951, part of a cutback of minor routes after the war. The whole route closed to goods in 1964, though a short stub at the Hatfield end lasted until 1968.

    During construction of the Midland main line in the 1860s, a branch was laid from near How Wood to the Midland route to carry building materials. Never used by passenger services, Ordnance Survey maps indicate it closed between 1883 and 1898 although the embankment and some bridge abutments remain very visible. As part of a cost-cutting plan in the 1980s, British Rail examined reopening this, with the aim of diverting the branch to the City station and selling off the valuable Abbey station site.

    Operations

    Passenger services are operated by London Midland.

    Stations on the branch are unstaffed and tickets must be bought on the train, except at St Albans Abbey and Watford North which have a ticket machine, and Watford Junction which is staffed. If starting your journey at Watford Junction, in compliance with National Rail conditions of carriage, you must have a valid ticket prior to boarding the train.

    The Abbey line is part of the Network Rail Strategic Route 18, SRS 18.10 and is classified as a Rural line.

    Infrastructure

    The line is single track and is electrified at 25 kV AC using overhead line equipment. It has a loading gauge of W6 and a line speed of between 40 and 75 mph (64 and 121 km/h).

    Rolling stock

    The service is operated using EMUs. A Class 319 EMU is in regular use, with services formerly operated by Class 321 and Class 313 units before that. Rarely (more commonly in the past) a Class 150 DMU has been substituted. London Midland recently acquired the Class 319 trains to replace the Class 321 units acquired by Abellio ScotRail to operate on Glasgow's suburban rail network.

    Signalling

    Signalling is under "One Train Working" (without Train Staff) rules, where only one train is allowed on the line at a time. Trains can be moved into Watford Junction yard by a manual ground frame there. On 28 October 2005 its incorrect operation caused an incident with a train not in passenger service.

    There is an automatic level crossing outside Watford North. This is operated by a manual plunger for trains heading towards St Albans, and by a treadle towards Watford Junction.

    The future

    Since 1995 the Abbey Flyer Users Group (ABFLY) has been campaigning to secure the future of the line and encourage its growth. The Abbey line was designated by the Strategic Rail Authority as a community rail line in July 2005, one of seven pilots under the Community Rail Development Strategy.

    In 2004 a proposal was made by Transport for London for a London Regional Rail Authority to take control over some rail services that extended out of Greater London, including the branch line.

    On 30 October 2009 Secretary of State for Transport Lord Adonis announced a plan to increase frequency on the line by allowing Hertfordshire County Council to lease the line from Network Rail and converting it to light rail from 2011. It was hoped that this would be possible for the same amount of subsidy the line received, as the new infrastructure required, such as a passing loop would be cheaper for light rail than heavy rail. Longer-term proposals envisaged extensions into Watford town centre via Clarendon Road and High Street, and St Albans city centre, possibly as far as St Albans City railway station, and possible re-instatement of the line to Hatfield.

    The light rail plan was cancelled in May 2013, as it was found to be impossible to deliver the scheme within the existing heavy rail subsidy as planned and more complicated than had been expected with disputes over apportionment of ticket revenue and who was responsible for the cost of maintaining structures. Hertfordshire County Council pledged to prepare a more ambitious bid to the DfT for funding for full segregation from the national rail network and extensions on either end rather than to lease the line from Network Rail.

    In a Draft Rail Strategy consultation published in June 2015, Hertfordshire County Council highlighted the difficulties presented by single-track operation on the Abbey line, in particular the fact that the maximum service frequency that can be operated is one train per 45 minutes. The report notes that the service pattern makes it difficult to enable interchange connections with other rail services and to offer a "clockface" timetable that is memorable to passengers. Among the solutions evaluated by Hertfordshire are: a proposal to reopen the passing loop at Bricket Wood; running trains which skip certain stations; closing some stations; conversion of the line to light rail operation; and conversion of the line to a guided busway. The passing loop solution would enable a 30-minute service, but the report notes that there would be an additional cost of running the line with two train sets (rather than a single train, as at present), and that it would be "difficult to achieve a favourable business case". The report states that a light rail or busway solution would be quicker to implement and offer higher service frequencies, although the capacity of such vehicles would fall from 60,000 passengers per hour to 2000, and concludes that these alternative modes would offer a stronger "business case" than heavy rail. The ABFLY campaign group has criticised the busway proposal, citing environmental concerns about replacing an electric train service with a diesel bus service and rejecting plans to replace the tracks with a concrete busway.

    Other proposals considered included adding the Abbey line as a branch of the proposed extension of Crossrail to Milton Keynes Central; this proposal was rejected due to the technical challenges associated with upgrading the Abbey line to accommodate Crossrail trains.

    References

    Abbey line Wikipedia


    Similar Topics