Kalpana Kalpana (Editor)

3rd Narmada Bridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Length
  
1,400 m

3rd Narmada Bridge

The 3rd Narmada Bridge is an extra dosed bridge, presently under construction in Bharuch, India. It is 1.4 km long bridge, build over river Narmada on NH-8. The four-lane bridge is a part of larger project involving six laning of a section of NH-8 between Vadodara and Surat. It runs parallel to Sardar Bridge, which was built by then Prime Minister Indira Gandhi. After completion it will be the longest extra dosed bridge in India.

Bridge is under construction by Larsen & Toubro and Dywidag Systems International (DSI-Bridgecon) . The estimated cost of bridge is 379 cr INR. This bridge is set to be inaugurated by Prime Minister Narendra Modi on March 7, 2017 and would be open to public immediately after that.

References

3rd Narmada Bridge Wikipedia