Kalpana Kalpana (Editor)

183A Toll Road

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Existed:
  
2007 – present

Counties:
  
Williamson

Constructed
  
2007

North end:
  
US 183 in Leander

Length
  
17.2 km

County
  
Williamson County, Texas

South end:
  
US 183 / SH 45 Toll / RM 620 in Cedar Park

183a toll road goes cashless


The 183A Toll Road or 183A is a toll road in the Austin metropolitan area of the U.S. state of Texas. The road includes sections in north Austin, Cedar Park, and Leander. It provides a bypass for U.S. Highway 183. The road is owned and operated by the Central Texas Regional Mobility Authority. The 183A Toll road is electronic only and has no cash toll booths. Motorists driving without a toll tag will receive a bill in the mail payable within 30 days. The tolled portion of the highway runs from US 183 near SH-45 to Ranch Road 1431 in Cedar Park. A free portion runs back to US-183 north of Leander, Texas along what will become free frontage roads.

Contents

Map of 183A, Texas, USA

Route description

The 183A Toll Road starts in Austin at an interchange with US 183 and SH 45. The freeway runs north to a point near Fenway Park where US 183 turns off to the north-northwest. From that location, the toll road runs to the north through an area composed of residential subdivisions. Near Heritage Park, there is an interchange for Whitestone Boulevard near some commercial developments. Near the interchange with RM 2243, 183A turns to the northwest and ends at a connection with US 183 in Leander.

Violation fees

If a TxTag holder (or customer of any other acceptable toll-tag) has a TxTag account with a negative balance, Municipal Services Bureau (MSB) will mail a separate bill with a higher fee.

Violation fees are fees added to an unpaid pay-by-mail bill. An unpaid bill can accrue up to $60 in fees after 90 days.

History

The first section of the toll road opened in March 2007 between RM 620 and RM 1431. As initial traffic was higher than expected, the toll road was extended 5 miles to the north. The extension opened on April 6, 2012 at a cost of $105 million.

Exit list

The entire route is in Williamson County. All exits are unnumbered.

References

183A Toll Road Wikipedia