Yadavaran Field oil field is one of the NIOC Recent Discoveries which is located in Khuzestan, Iran.

The name is new, as the field is made up of two former fields, Koushk (discovered in 2000) and Hosseinieh (discovered in 2002). After researchers discovered that the two fields were actually connected, the field was renamed as the Yadavaran Field.

Yadavaran Field Iran Announces Competition for China Oil Firms in Developing Future

The field is estimated to have reserves of up to 17 billion barrels (2.7 km³) of oil, with 3 billion barrels (0.5 km³) considered to be recoverable.

Yadavaran Field Yadavaran Field Details IranOilGas Network

On October 29, 2004, Iran negotiated a $70 billion deal with Sinopec, giving the Chinese company a 51% stake in the field's development. As part of the deal, China agreed to buy 10 million metric tons of liquefied natural gas (LNG) from Iran per annum for 25 years.

Yadavaran Field Yadavaran project progresses by 94

On December 2007, NIOC and Sinopec signed the final agreement for development of Yadavaran oil field. Based on the contract field will reach to the 180,000 bbl/d (29,000 m3/d) of production capacity. Sinopec will be operator with a 51% stake in the project and NIOC holding the remaining interest. Total project cost at around US$2 billion. In a third phase the field is expected to reach 300,000 bbl/d (48,000 m3/d) of production capacity.

Yadavaran Field Farsnews

The field will be developed under an enhanced Iranian buyback contract. The most significant revision in terms from earlier versions is that the partners will only agree the target capital cost of the development following receipt of construction tender submissions. This should reduce the contractors’ exposure to value erosion through cost inflation.

Yadavaran Field Chinas Sinopec to develop Yadavaran oilfield

The oil field is currently at an early production of 16,000 bbl/d (2,500 m3/d) after 16 months development by the Chinese contractor.

Yadavaran Field Sinopec to 2nd phase develop irans yadavaran oil field