Girish Mahajan (Editor)

West Coast Line (Taiwan)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Native name
  
縱貫線

Opened
  
10 August 1902

Track gauge
  
3 ft 6 in (1,067 mm)

Stations
  
91

Operating speed
  
Varies

Type
  
Heavy rail

Number of tracks
  
Varies

Termini
  
Kaohsiung Station

Line length
  
404.5 km (251.3 mi)

Operator(s)
  
Taiwan Railways Administration

Owner
  
Taiwan Railways Administration

West Coast Line or Main Line (Chinese: 縱貫線) is a railway line of the Taiwan Railway Administration running along Taiwan's densely populated western corridor. As a result, it is by far the busiest line, having served over 171 million passengers in 2016. The total length of the line is 404.5 km.

The coastal section between Zhunan and Changhua is known as Coastal Line (海線) and is 90.2 km long. It was built after Taichung Line, which is also known as Mountain Line (山線). Many express services take the Taichung route. Train schedules and departure boards mark either "山線" or "海線" to indicate the route taken. Despite being inconsistently less advanced than other sections and Taichung Line, the Coastal Line is classified as part of the main line while Taichung Line is considered a separate line.

History

The original railroad between Keelung and Twatutia was completed in 1891. The section between Twatutia and Hsinchu was finished in 1893. However, these sections were all rebuilt at the beginning of the 20th century during Japanese rule. The northern and southern sections and the Taichung Line were completed in 1908. The Coastal Line, finished in 1922, was used to relieve congestion near Taichung.

References

West Coast Line (Taiwan) Wikipedia