Country
  
Japan

Opening date
  
1954

Length
  
283 m (928 ft)

Opened
  
1954

Owner
  
Tohoku Electric Power

Impound
  
Tadami River

Location
  
Kaneyama

Impounds
  
Tadami River

Height
  
34 m

Catchment area
  
2,402 kmĀ²

Construction began
  
1952

Uwada Dam httpsuploadwikimediaorgwikipediacommonsthu

Dam volume
  
23,000 m (30,083 cu yd)

Similar
  
Asahi Dam, Otori Dam, Honna Dam, Ouchi Dam, Fujinuma Dam

Uwada Dam is a gravity dam on the Tadami River 500 m (1,640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan. It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation. It supplies a 63.9 MW power station with water.

References

Uwada Dam Wikipedia