Country
  
Tanzania

Status
  
Operational

Owner
  
TANESCO

Location
  
Ubungo, Dar es Salaam

Commission date
  
2012

Construction began
  
2011

Ubungo II Thermal Power Station

Official name
  
Ubungo II Thermal Power Station

Operator(s)
  
Tanzania Electric Supply Co.

Ubungo II Thermal Power Station was an extension to the Ubungo I Power Station and began commercial operations in 2012. The power-plant is located in Ubungo, Dar-es-salaam and has an installed capacity of 100 megawatts (130,000 hp).

History

Symbion Power already had extensive electrification contracts within Tanzania. Symbion helped build a power plant in May 2011 and was operational in under one month. The introduction of the Symbion Power Plant to the Tanzanian electricity helped alleviate the problems experienced in the country caused by severe power shedding. Symbion's projects were funded by the Government of the United States through the Millennium Challenge Corporation.

The Power plant was handed over to the Tanzania Electric Supply Company in June 2011 and TANESCO planned to convert the current power plant to a permanent facility. TANESCO awarded Jacobsen Elektro AS from Norway to construct the Ubungo II Gas Based Power Plant. Jacobsen ordered three SGT-800 gas turbines from Siemens with a total capacity of 100 megawatts (130,000 hp).

The Ubungo II Gas Based Power Plant was constructed in 14 months and began operations on 1 July 2012. Unlike the Ubungo I plant, this plant is owned and operated entirely by TANESCO. However the gas for this plant is still obtained by Songas.