Kalpana Kalpana (Editor)

USS Ralph Johnson

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Namesake
  
Ralph H. Johnson

Laid down
  
12 September 2014

Construction started
  
12 September 2014

Length
  
156 m

Beam
  
20 m

Ordered
  
26 September 2011

Christened
  
2 April 2016

Launched
  
12 December 2015

Displacement
  
8.362 million kg

Builder
  
Ingalls Shipbuilding

USS Ralph Johnson USS Ralph Johnson DDG 114

Name
  
Ralph Johnson (DDG-114)

Sponsored by
  
Georgeann Brady McRaven

New navy destroyers named uss john finn uss ralph johnson and uss rafael peralta


Ralph Johnson (DDG-114) will be an Arleigh Burke-class destroyer. The contract to build her was awarded on 26 September 2011 to Ingalls Shipbuilding of Pascagoula, Mississippi. On 15 February 2012, Secretary of the Navy Ray Mabus announced the ship's named to be Ralph Johnson in honor of Marine Ralph H. Johnson, who was posthumously awarded the Medal of Honor for shielding two fellow Marines from a grenade in March 1968 during the Vietnam War. The contract was worth $697.6 million fixed price, and was also the 30th Arleigh Burke-class destroyer contract issued to Ingalls Shipbuilding.

USS Ralph Johnson httpsuploadwikimediaorgwikipediacommonsthu

Ralph Johnson will be the 64th ship of the Arleigh Burke class of destroyers, the first of which, USS Arleigh Burke (DDG-51), was commissioned in July 1991. With 75 ships planned to be built in total, the class has the longest production run for any U.S. Navy surface combatant. As an Arleigh Burke-class ship, Ralph Johnson's roles included anti-aircraft, anti-submarine, and anti-surface warfare, as well as strike operations. During it long production run, the class was built in three flights—Flight I (DDG-51–DDG-71), Flight II (DDG-72–DDG-78), and Flight IIA (DDG-79– ). Ralph Johnson will be a Flight IIA ship, and as such, will feature several improvements in terms of ballistic missile defence, an embarked air wing, and the inclusion of mine-detecting ability.

USS Ralph Johnson Video USS Ralph Johnson Moves to Dry Dock Naval Today

In 2008, the U.S. Navy decided to restart production of the Arleigh Burke class as orders for the Zumwalt-class destroyer was reduced from ten to three. The first three ships (DDG-113—DDG-115) ordered following the product decision are known as the "restart" ships, while "technology insertion" ships (DDG-116—DDG-123) are expected to incorporate certain elements of Arleigh Burke class Flight III, which in turn will run from DDG-124 onwards. As a "restart" ship, Ralph Johnson will primarily feature upgraded avionics; she was originally scheduled to be delivered in August 2016, but construction was delayed and delivery is scheduled for late 2017 after her sea trials are completed in the middle of the year.

USS Ralph Johnson USS Ralph Johnson Ralph H Johnson VA Medical Center
USS Ralph Johnson Destroyer Photo Index DDG114 USS Ralph Johnson

References

USS Ralph Johnson Wikipedia