Samiksha Jaiswal (Editor)

USS Puritan (1864)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
USS Puritan

Ordered
  
28 July 1862

Laid down
  
1863

Construction started
  
1863

Tonnage
  
2.962 million kg

Namesake
  
Puritan

Builder
  
Continental Iron Works

Commissioned
  
Never commissioned

Launched
  
2 July 1864

USS Puritan was originally designed as a double-turreted ironclad monitor, the plans were altered to the specifications of John Ericsson, Puritan's builder, following a long debate with the Navy; she was built with a single turret.

Contracted 28 July 1862 to Ericsson, who in turn subcontracted the hull to the Continental Iron Works of Greenpoint, New York and the machinery to the Allaire Iron Works of New York City, she was launched 2 July 1864. However, due to delays in construction and the casting of the 20-inch smoothbores she was never completed, her construction being suspended in 1865.

After the war, Puritan deteriorated on the stocks. In 1874–75 Secretary of the Navy George Robeson decided to carry out extensive repairs on Puritan. Funds were not appropriated for new construction, but the condition of the ship’s hulls necessitated building essentially new ships, bearing no real resemblance to the originals. A scandal resulted when it was discovered that Robeson was paying for new ships with the old ones; the first Puritan was turned over to John Roach of Chester, Pennsylvania as partial payment for the “unauthorized” construction of the second Puritan.

References

USS Puritan (1864) Wikipedia