Puneet Varma (Editor)

USS O 1 (SS 62)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
USS O-1

Laid down
  
26 March 1917

Decommissioned
  
11 June 1931

Construction started
  
26 March 1917

Length
  
52 m

Builder
  
Portsmouth Naval Shipyard

Ordered
  
3 March 1916

Commissioned
  
5 November 1918

Struck
  
18 May 1938

Launched
  
9 July 1918

Test depth
  
61 m

USS O-1 (SS-62) httpsuploadwikimediaorgwikipediaenthumbf

USS O-1 (SS-62) was the lead ship of her class of submarines built for the United States Navy during World War I.

Contents

Description

The O-class submarines were designed to meet a Navy requirement for coastal defense boats. The submarines had a length of 172 feet 3 inches (52.5 m) overall, a beam of 18 feet 1 inch (5.5 m) and a mean draft of 14 feet 5 inches (4.4 m). They displaced 521 long tons (529 t) on the surface and 629 long tons (639 t) submerged. The O-class submarines had a crew of 29 officers and enlisted men. They had a diving depth of 200 feet (61.0 m).

For surface running, the boats were powered by two 440-brake-horsepower (328 kW) diesel engines, each driving one propeller shaft. When submerged each propeller was driven by a 370-horsepower (276 kW) electric motor. They could reach 14 knots (26 km/h; 16 mph) on the surface and 10.5 knots (19.4 km/h; 12.1 mph) underwater. On the surface, the O class had a range of 5,500 nautical miles (10,200 km; 6,300 mi) at 11.5 knots (21.3 km/h; 13.2 mph).

The boats were armed with four 18-inch (45 cm) torpedo tubes in the bow. They carried four reloads, for a total of eight torpedoes. The O-class submarines were also armed with a single 3"/50 caliber deck gun.

Construction and career

O-1 was laid down on 26 March 1917 at the Portsmouth Navy Yard in Kittery, Maine. She was launched on 9 July 1918, and commissioned on 5 November 1918 with Lieutenant Commander Norman L. Kirk in command. Commissioned just before the Armistice with Germany, O-1 operated in the Atlantic coastal waters from Cape Cod to Key West, Florida, after World War I. Reclassified a second-line submarine on 25 July 1924, and first-line on 6 June 1928, O-1 was converted to an experimental vessel on 28 December 1930, and operated in this capacity out of the submarine base at New London, Connecticut, until decommissioning on 11 June 1931. She was stricken from the Naval Vessel Register on 18 May 1938 and sold for scrap.

References

USS O-1 (SS-62) Wikipedia