Rahul Sharma (Editor)

USS North Carolina (SSN 777)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
North Carolina

Laid down
  
22 May 2004

Acquired
  
21 February 2008

Construction started
  
22 May 2004

Displacement
  
7.076 million kg

Beam
  
10 m

Ordered
  
30 September 1998

Christened
  
21 April 2007

Length
  
115 m

Launched
  
21 April 2007

Weight
  
7,925 tons

Builder
  
Newport News Shipbuilding

USS North Carolina (SSN-777) Navy39s most cuttingedge submarine tech ever photos

Namesake
  
State of North Carolina

USS North Carolina (SSN-777), a Virginia-class attack submarine, is the fourth ship of the United States Navy named for the 12th U.S. state.

USS North Carolina (SSN-777) USS North Carolina SSN777 Arrives In Japan Global Military Review

The contract to build her was awarded to Northrop Grumman Newport News on 30 September 1998 and her keel was laid down on 24 May 2004. She was launched on 5 May 2007.

USS North Carolina (SSN-777) USS North Carolina SSN 777 VirginiaClass Submarine North

North Carolina was commissioned on 3 May 2008. This class of submarine is unique in that it features a Photonics Mast Program (PMP) that freed ship designers to place the boat's control room in a lower, less geometrically-constrained space than would be required by a standard, optical tube periscope. It is additionally unique in the U.S. Navy for featuring all-digital ship and ballast control systems that are manned by relatively senior watchstanders and a pressure chamber to deploy SEAL divers while being submerged.

USS North Carolina (SSN-777) httpsuploadwikimediaorgwikipediacommonsthu

History

USS North Carolina (SSN-777) Submarine Photo Index

The contract to build her was awarded to Northrop Grumman Newport News (then called Newport News Shipbuilding & Drydock Company) in Newport News, Virginia on 30 September 1998 and her keel was laid down on 22 May 2004. She was christened on 21 April 2007 sponsored by Linda Bowman, wife of Admiral Frank L. "Skip" Bowman, the former director of Naval Reactors. Captain Mark E. Davis, a native of upstate New York, was the ship’s first commanding officer and leads a crew of approximately 134 officers and enlisted personnel.

USS North Carolina (SSN-777) FileUS Navy 101115N3560G003 The Virginiaclass attack submarine

The boat has physical connections to previous North Carolinas. Sections of the teak decking from the previous North Carolina are reused within the submarine, and several pieces from a silver serving set made for the armored cruiser ACR-12, then transferred through the state governor to the battleship will be used aboard SSN-777.

USS North Carolina (SSN-777) FileUSS North Carolina SSN777 2008jpg Wikimedia Commons

North Carolina joined the fleet on 21 February 2008, after problems with the boat's steam valve and internal piping system had forced two delays in the acceptance of the vessel. Welding issues in the internal piping system scuttled a first-planned December 2007 delivery, and the discovery of an inadequate steam valve forced a further delay from January to February 2008.

The ship's official commissioning ceremony was held on 3 May 2008, in Wilmington, North Carolina. The submarine joined the U.S. Navy's Atlantic Fleet based in New London, Connecticut.

In 2010, North Carolina changed homeports from Naval Submarine Base New London to Naval Station Pearl Harbor. She left Groton for Pearl Harbor on 22 July 2010 and arrived at her new homeport, Joint Base Pearl Harbor-Hickam, on Monday, 15 November 2010 after her four-month transfer activities. During the transfer, the officers and crew of North Carolina conducted a series of exercises designed to test the boat's new combat systems and stealth capabilities. North Carolina is the third Virginia-class attack submarine to be homeported at Joint Base Pearl Harbor-Hickam and is assigned to Commander, Submarine Squadron 1. Received squadron 1 battle E for year 2015.

References

USS North Carolina (SSN-777) Wikipedia