Supriya Ghosh (Editor)

USS Memphis (SSN 691)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
Memphis

Laid down
  
23 June 1973

Commissioned
  
17 December 1977

Launched
  
3 April 1976

Beam
  
10 m

Awarded
  
4 February 1971

Sponsored by
  
Mrs. Cathy Beard

Construction started
  
23 June 1973

Length
  
110 m

Builder
  
Newport News Shipbuilding

USS Memphis (SSN-691) MaritimeQuest USS Memphis SSN691 Page 1

Namesake
  
The City of Memphis, Tennessee

USS Memphis (SSN-691), a Los Angeles-class submarine, was the sixth ship of the United States Navy to be named for Memphis, Tennessee. The contract to build her was awarded to Newport News Shipbuilding and Dry Dock Company in Newport News, Virginia on 4 February 1971 and her keel was laid down on 23 June 1973. She was launched on 3 April 1976 sponsored by Mrs. Cathy Beard, and commissioned on 17 December 1977, with Commander G. Dennis Hicks in command.

In March 1981, Memphis completed an around-the-world cruise via the Panama Canal, including operations with both the Sixth and Seventh Fleets.

USS Memphis (SSN-691) MaritimeQuest USS Memphis SSN691 Page 1

Memphis was redesignated an experimental submarine during 1989 to test composite hull structures, unmanned underwater vehicles, advanced sonars, hull friction reduction, and other advanced technologies for the Los Angeles and Seawolf classes, but remained combat-capable.

USS Memphis (SSN-691) httpsuploadwikimediaorgwikipediacommonsthu

During a mid-1990s refit, Memphis received numerous modifications, which added about 50 tons to her displacement, most of it aft.

USS Memphis (SSN-691) SSN691 USS Memphis

  • a glass-reinforced plastic (GRP) turtleback abaft the sail to accommodate remotely operated vehicles
  • a towing winch and drum for experimental towed sonar arrays
  • 4.27 m-high by 1.37 m-wide vertical surfaces at the ends of the stern stabilizers to accommodate sonar transducer arrays
  • a 54 mm towed array dispenser in the port fin leading to the new winch abaft the sail
  • supports for the stern stabilizers
  • new hydraulic systems
  • a fiber-optic databus
  • 58 standardized equipment racks to accommodate electronic test gear

  • USS Memphis (SSN-691)

    In January 1994 Memphis entered Portsmouth Naval Shipyard for refueling, overhaul and modifications to support her research and development role. Upon completion of the shipyard availability she was assigned to Submarine Development Squadron 12 in Groton, Connecticut.

    In 1998 Memphis tested the Lockheed Martin Undersea Systems Universal Gravity Module (UGM) passive bottom profiler navigational system.

    On 3 May 2005, Memphis deployed conducting two polar transits, returning to New London on 3 November 2005.

    Memphis won the coveted Battenberg Cup in 2005, as well as the Squadron 12 Battle E.

    On 6 May 2006, Memphis deployed against Iraqi insurgency, returning to New London, Connecticut, on 7 August.

    On 27 June 2007, Memphis returned to Portsmouth Naval Shipyard in Kittery, Maine, for a Pre-Inactivation Restricted Availability. She returned to Groton on 8 May 2008.

    After 33 years of service Memphis was taken out of service in a decommissioning ceremony at the Shepherd of the Sea Chapel located at the US Submarine Base in Groton, Connecticut on 1 April 2011. Memphis went to the Portsmouth Naval Shipyard to begin the inactivation process.

    Parts from the decommissioned Memphis were to be used to repair the damaged USS Miami, until the decision to cease work on the Miami was made in August 2013.

    Cheating controversy

    In November 2010, Navy investigators discovered rampant cheating taking place on training exams among the sub's crew. The sub's skipper, Commander Charles Maher was removed. Thirteen other crewmembers were also removed. Navy officers interviewed by the Associated Press stated that training exam cheating was widespread within the navy's submarine force.

    References

    USS Memphis (SSN-691) Wikipedia