Puneet Varma (Editor)

USS Lyndon B. Johnson

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
Lyndon B. Johnson

Laid down
  
30 January 2017

Length
  
183 m

Weight
  
14,800 tons

Awarded
  
15 September 2011

Status
  
Under construction

Construction started
  
30 January 2017

Builder
  
Bath Iron Works

USS Lyndon B. Johnson US Navy Railgun Laser Cannon Deployed On Zumwalt Destroyer USS

Namesake
  
U.S. President Lyndon B. Johnson

Class and type
  
Zumwalt-class destroyer

USS Lyndon B. Johnson (DDG-1002) will be the third and final Zumwalt-class destroyer built for the United States Navy. The contract to build her was awarded to Bath Iron Works located in Bath, Maine, on 15 September 2011. The award, along with funds for the construction of USS Michael Monsoor, was worth US$1.826 billion. On 16 April 2012, Secretary of the Navy Ray Mabus announced the ship would be named Lyndon B. Johnson in honor of Lyndon B. Johnson, who served as the 36th President of the United States from 1963 to 1969. Johnson served in the Navy during World War II, when he was awarded the Silver Star, and ultimately reached the U.S. Naval Reserve rank of commander. DDG-1002 is the 34th ship named by the Navy after a U.S. president.

USS Lyndon B. Johnson USS Lyndon B Johnson The Motor Pool Blog

History

USS Lyndon B. Johnson USS Lyndon B Johnson reviewed by Pentagon for cancellation US

Lyndon B. Johnson will be a Zumwalt-class destroyer. Although 32 ships were originally planned for that class of ship, the U.S. Navy eventually reduced this number to three units. Designed as multi-mission ships with an emphasis on land attack and littoral warfare, the class features the tumblehome hull form, reminiscent of ironclad warships. In January 2013 the Navy solicited bids for a steel deckhouse as an option for Lyndon B. Johnson instead of the composite structures of the other ships in the class. This change was made in response to cost overruns for the composite structure, but due to the tight weight margins in the class, required weight savings in other parts of the ship.

USS Lyndon B. Johnson httpsuploadwikimediaorgwikipediacommonsthu

In February 2015, the Navy revealed they had begun engineering studies to include an electromagnetic railgun on Lyndon B. Johnson. The Zumwalt class has been identified as more suited to use emerging technologies, like railguns, due to its superior electricity generation capability over previous destroyers and cruisers at 80 megawatts; Lyndon B. Johnson specifically was being studied because it is the latest of the class, while the previous two ships would be less likely to initially field the capability due to the testing schedule. The railgun would likely replace one of the two Advanced Gun Systems. By March 2016, construction had become too far along to install the railgun during building, but it can still be added later.

USS Lyndon B. Johnson USS Lyndon B Johnson is the third and final Zumwaltclass destroyer

In September 2015, it was reported that U.S. Department of Defense officials were considering terminating funding for Lyndon B. Johnson prior to her completion. Although considered as a cost-saving measure, cancelling the third Zumwalt ship at that stage was likely not possible, and might have ended up actually costing more after paying program shutdown costs and contract termination penalties. By December 2015, the Pentagon had decided in favor of keeping the ship.

USS Lyndon B. Johnson The Dragon39s Tales US Navy Wants to Place Railgun on USS Lyndon B

The ceremonial keel laying of Lyndon B. Johnson took place on 30 January 2017, by which time construction of the ship was over half finished.

USS Lyndon B. Johnson Navy39s Steel Deckhouse Decision for Final Zumwalt is a Blow to HII

References

USS Lyndon B. Johnson Wikipedia