Rahul Sharma (Editor)

USS Haleakala (AE 25)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
USS Haleakala (AE-25)

Awarded
  
23 August 1956

Acquired
  
16 October 1959

Construction started
  
3 February 1958

Length
  
156 m

Displacement
  
7.53 million kg

Namesake
  
Haleakala

Laid down
  
3 February 1958

Commissioned
  
3 November 1959

Launched
  
17 February 1959

Weight
  
8,433 tons

USS Haleakala (AE-25) Ships of the NitroSuribachi Class AEs

Builder
  
Bethlehem Shipbuilding Corporation

USS Haleakala (AE-25) was a Nitro-class ammunition ship of the United States Navy in service from 1959 to 1993.

USS Haleakala (AE-25) wwwnavsourceorgarchives090509052516jpg

The USS Haleakala (AE-25) was launched on 17 February 1959 by Bethlehem Shipbuilding Corporation in Baltimore, Maryland and was sponsored by Mrs. Maurice E. Curts, wife of Vice Admiral Maurice Curts. Haleakala was commissioned 3 November 1959, with Captain Miles P. Refo, III in command.

USS Haleakala (AE-25) USS Haleakala AE25 Wikipedia

After shakedown out of Guantanamo Bay Haleakala transited the Panama Canal and visited Chile and Costa Rica before arriving at San Francisco, 17 March 1960. The fifth of a new class of ammunition ships designed from the hull up for carrying and transferring at sea the latest in munitions and guided missiles, Haleakala spent the first part of April with Vega (AF-59) conducting replenishment exercises to test new equipment.

USS Haleakala (AE-25) Ammunition Ship Photo Index

Haleakala departed San Francisco 7 July 1960 on her first Western Pacific deployment. Visiting Pearl Harbor, Yokosuka, and Sasebo, she provided services to various units of the 7th Fleet before returning to Port Chicago, California, 19 December 1960.

USS Haleakala (AE-25) FileUSS Haleakala AE25 at sea c1965jpg Wikimedia Commons

Haleakala departed on her second deployment to the Western Pacific 18 April 1961 and again serviced units of the 7th Fleet, returning to Port Chicago 8 September. In October, in company with Mount Katmai (AE-16), she steamed to Long Beach to participate in Exercise "Covered Wagon", an effort to test realistically a representative Attack Carrier Strike Force in all of its wartime tasks in the face of opposition similar to that which might be expected of a potential enemy.

USS Haleakala (AE-25) FileUSS Haleakala AE25 at Subic Bay in 1991JPEG Wikimedia Commons

Haleakala made two subsequent deployments to the Western Pacific between 29 May 1962 and February 1964. She arrived Todd Shipyards, Seattle, 25 February 1964 for overhaul and modernization to increase her efficiency and safety. With conversion completed by May 1965, through the fall of 1965 Haleakala participated in Operation Baseline. On 20 November she sailed for Yankee Station via Pearl Harbor to support combat operations in Vietnam, returning to Subic Bay 13 December.

USS Haleakala (AE-25) FileUSS Haleakala AE25 in 1982JPEG Wikimedia Commons

Most of 1966 was spent on another Western Pacific deployment. Haleakala departed Subic Bay 23 August for the West Coast, arriving San Francisco 12 September. After training exercises off Mare Island through December, Haleakala returned for further replenishment operations off Vietnam into 1967.

On August 27, 1969 the ship experienced a catastrophic flare back, in no.2 boiler, which also knocked out no.1 boiler, stopping the ship dead in the water.[1] The next day a harbor tug YTB 779, towed the Haleakala to Da Nang, Vietnam.[2] On the 29th the fleet tug USS Cocopa ATF -101, began to tow her to Subic Bay, PI.[3] Then on the 30th she broke tow and steamed into Subic Bay under her own power, after no.1 boiler was repaired.[4] The USS Haleakala stayed in Subic Bay for the next two months, until both boilers were repaired, and sea trials began on October 30th.[5]

References

USS Haleakala (AE-25) Wikipedia


Similar Topics