Kalpana Kalpana (Editor)

USS Conemaugh (1862)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
USS Conemaugh

Commissioned
  
16 July 1862

Struck
  
1867 (est.)

Draft
  
2.4 m

Laid down
  
date unknown

Decommissioned
  
27 July 1867

Length
  
71 m

USS Conemaugh (1862) httpsuploadwikimediaorgwikipediacommonsthu

Launched
  
1 May 1862 at Portsmouth Navy Yard, Kittery, Maine

USS Conemaugh (1862) was a side-wheel steamer in the United States Navy during the American Civil War. With her large crew of 125 and her powerful guns, she was assigned as a gunboat on the Union blockade of the Confederate States of America.

Contents

Launched in Maine in 1862

Originally named Cinemaugh, she was renamed on 24 December 1861, launched on 1 May 1862 by Portsmouth Navy Yard, Kittery, Maine; and commissioned on 16 July 1862, Lieutenant R. Werden in command.

Assigned to the South Atlantic blockade

Conemaugh sailed from Portsmouth on 19 July 1862, and arrived at Port Royal, South Carolina on 30 July to join the South Atlantic Blockading Squadron. She patrolled and served as a picket frequently engaging Confederate batteries and detachments of troops along stream banks. Among such exchanges were those with the Cat Island battery on 5 March, 13 April and 23 May 1863 and Fort Wagner on 11 July-12 July. Conemaugh entered Philadelphia Navy Yard on 19 September and was placed out of commission four days later for overhaul.

Assigned to the West Gulf blockade

Clearing Philadelphia, Pennsylvania on 24 January 1864, Conemaugh arrived at Key West on 1 February for duty with the West Gulf Blockading Squadron. She carried stores and ordnance to the ships off Mobile, Alabama. She captured the blockade runner Judson on 30 April and sent her into Ship Island with her valuable cargo of cotton and turpentine.

With Admiral David Farragut's fleet, Conemaugh landed troops on Dauphin Island on 3 August and participated in the celebrated Battle of Mobile Bay on 5 August. She sailed from Key West on 5 November for overhaul at Philadelphia.

Reassigned to the South Atlantic blockade

From 20 May-22 November 1865, Conemaugh cruised the coast of North and South Carolina with the South Atlantic Blockading Squadron. She lay at Norfolk, Virginia from 25 November 1865 – 27 May 1866, then was assigned to the North Atlantic Squadron.

Post-war decommissioning

Conemaugh cruised on the coast of the Carolinas and Florida until 23 July 1867, when she put in to New York Navy Yard where she was decommissioned on 27 July and sold on 1 October.

References

USS Conemaugh (1862) Wikipedia