Suvarna Garge (Editor)

USS Casimir Pulaski (SSBN 633)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Ordered
  
20 July 1961

Commissioned
  
14 August 1964

Construction started
  
12 January 1963

Length
  
130 m

Laid down
  
12 January 1963

Decommissioned
  
7 March 1994

Launched
  
1 February 1964

Test depth
  
396 m

USS Casimir Pulaski (SSBN-633) httpsuploadwikimediaorgwikipediacommonsthu

Namesake
  
Casimir Pulaski (1745–1779), a Polish general who served in the American Revolutionary War

Sponsored by
  
Mrs. John A. Gronouski, Jr.

Builder
  
General Dynamics Electric Boat

USS Casimir Pulaski (SSBN-633), a James Madison-class ballistic missile submarine, was the second ship of the United States Navy to be named for Casimir Pulaski (1745–1779), a Polish general who served in the American Revolutionary War.

Contents

Construction and commissioning

The contract to build Casimir Pulaski was awarded to the Electric Boat Division of the General Dynamics Corporation in Groton, Connecticut, on 20 July 1961 and her keel was laid down there on 12 January 1963. She was launched on 1 February 1964, sponsored by Mrs. John A. Gronouski, Jr., and commissioned on 14 August 1964, with Captain Robert L. J. Long in command of the Blue Crew and Commander Thomas B. Brittain, Jr., in command of the Gold Crew.

Service history

History from 1964 to 1994 needed.

On May 1, 1989 Casimir Pulaski participated in Exercise Lantcoop 1-89.

Decommissioning and disposal

After her final cruise under Commander Kenneth W. Wrona, Casimir Pulaski was decommissioned on 7 March 1994 and simultaneously stricken from the Naval Vessel Register. Her scrapping via the Nuclear-Powered Ship and Submarine Recycling Program at Bremerton, Washington was completed on 21 October 1994.

References

USS Casimir Pulaski (SSBN-633) Wikipedia