Trisha Shetty (Editor)

U3 (Nuremberg U Bahn)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
U3 (Nuremberg U-Bahn)

The U3 is an underground line in Nuremberg. The line was opened on 14 June 2008. The stretch is about 5,3 km long. The Number of stations is 9. The start-and endstations are Maxfeld and Gustav-Adolf-Straße. U 3 trains are run driverless. (automatic guideway transit abbr.:AGT)

Contents

Stations

  • U1 = U1 (Nuremberg U-Bahn)
  • U11 = U11 (Nuremberg U-Bahn)
  • U2 = U2 (Nuremberg U-Bahn)
  • U21 = U21 (Nuremberg U-Bahn)
  • S1 = S1 (Nuremberg)
  • S2 = S2 (Nuremberg)
  • S3 = S3 (Nuremberg)
  • DB = Deutsche Bahn
  • Opening dates

  • 28 January 1984: Plärrer ↔ Rothenburger Straße
  • 23 September 1988: Plärrer ↔ Hauptbahnhof
  • 24 September 1990: Hauptbahnhof ↔ Rathenauplatz
  • 14 June 2008: Gustav-Adolf-Straße ↔ Rothenburger Straße
  • 14 June 2008: Rathenauplatz ↔ Maxfeld
  • expected 2011: Maxfeld ↔ Friedrich-Ebert-Platz
  • References

    U3 (Nuremberg U-Bahn) Wikipedia