Girish Mahajan (Editor)

U2 (Nuremberg U Bahn)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
U2 (Nuremberg U-Bahn)

The U2 is an underground line in Nuremberg. The line was opened on 28 January 1984. The stretch is about 13,1 km long. The Number of stations is 16. The start and end stations are Röthenbach and Flughafen, for the Boot-Line U21 Röthenbach and Ziegelstein.

Contents

Stations

  • U1 = U1 (Nuremberg U-Bahn)
  • U11 = U11 (Nuremberg U-Bahn)
  • U3 = U3 (Nuremberg U-Bahn)
  • S1 = S1 (Nuremberg)
  • S2 = S2 (Nuremberg)
  • S3 = S3 (Nuremberg)
  • DB = Deutsche Bahn
  • Opening dates

  • 28 January 1984: Plärrer ↔ Schweinau
  • 27 September 1986: Schweinau ↔ Röthenbach
  • 23 September 1988: Plärrer ↔ Hauptbahnhof
  • 24 September 1990: Hauptbahnhof ↔ Rathenauplatz
  • 29 September 1993: Rathenauplatz ↔ Schoppershof
  • 27 January 1996: Schoppershof ↔ Herrnhütte
  • 27 November 1999: Herrnhütte ↔ Flughafen
  • References

    U2 (Nuremberg U-Bahn) Wikipedia