Status Operational | Commission date October 2008 Avg. site elevation 446 ft | |
![]() | ||
Location near Trimdon Grange, County Durham |
Trimdon Grange Wind Farm is an onshore wind farm located near Trimdon Grange, County Durham, England. Commissioned in October 2008 it consists of four 1.3MW Nordex N60 turbines giving a total capacity of 5.2MW. It was developed by EDF and is operated by Cumbria Wind Farms.
The proposed location of the wind farm caused controversy in 2004 when an agent of Tony Blair, then Prime Minister, wrote to a local action group, Trimdon Area Group Against Wind Farms claiming that the site was unsuitable. The location is around a mile from Tony Blair's old constituency house.
References
Trimdon Grange Wind Farm Wikipedia(Text) CC BY-SA