Type Heavy rail Opened 1863 (1863) Electrification 3 kV DCoverhead line Terminis Cremona, Treviglio | Status in use Line length 65 km (40 mi) Owner Rete Ferroviaria Italiana | |
![]() | ||
Track gauge 1,435 mm (4 ft 8 ⁄2 in) |
History
The line was planned in the last years of the Austrian domination of Lombardy, and opened in 1863 after the Second Italian War of Independence.
It was electrified in 1977.
References
Treviglio–Cremona railway Wikipedia(Text) CC BY-SA