Rahul Sharma (Editor)

Tram route 8 (Antwerp)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
tram

Stations
  
29

Locale
  
Antwerp

System
  
Antwerp tram network

Opened
  
April 18, 2015

Tram route 8 (Antwerp)

Termini
  
Wommelgem Roundabout P+R Astrid (Antwerp premetro station)

Color on map
  
black text on pink background

Tram route 8 is a tram route in Antwerp and nearby Wommelgem. The present day route was opened on April 18, 2015 connecting the Astrid premetro station with the Wommelgem Roundabout (Dutch: "Rond punt van Wommelgem") P+R. The route is the first and thus far only route to use the newly opened premetro tunnel under Borgerhout, called the Reuzenpijp, which begins at Astrid station and comes above ground just before the Muggenberg stop. It is promoted as a faster light rail route, as most stations in the premetro tunnel have not (yet) been opened, allowing a 15-minute connection between the city center and the Wommelgem P+R.

Contents

Trajectory

Tram route 8 begins at the Wommelgem Roundabout P+R terminus. From there, it runs westward alongside the E313 to the Ruggeveldlaan. Via the Florent Pauwelslei and Herentalsebaan, the route then joins the older trajectory of tram 24. Past the Muggenberg stop, route 8 enters the recently opened premetro tunnel, while tram 24 uses the older above ground tracks. Underground, tram 8 follows the same trajectory as tram 24 does above ground, but, as most stations on the underground line have not (yet) been opened, it has far lesser stops. The route stops at Zegel station, and then continues on a non-stop trajectory under the Turnhoutsebaan and Carnotstraat towards it terminus, Astrid station, near Antwerp Central Station. Past Astrid, the tram route continues to the Franklin Rooseveltplaats, passing under the Gemeentestraat, where an underground turning loop has been built. The route then goes back to Astrid station, where passengers toward Borgerhout and Wommelgem can enter the tram.

Previous route

Originally tram route 8 ran between the Groenplaats in the city centre and the Eksterlaar terminus in Berchem. On December 31, 1978, the part of route 3 between the Groenplaats and Lambermontplaats to the south was transferred to route 8. The tram 8 continued to run on the Eksterlaar-Lambermontplaats trajectory in the following decades, with an exception in 1988, when, due to construction works in the Lange Leemstraat, the route had to use the premetro tunnel to the Groenplaats for several months.

On May 3, 2007, the tram 8 was extended from the Lambermontplaats to the nearby Bolivarplaats, where the new Antwerp courthouse had recently been built. On May 15, 2009, the line was once again extended, this time from the Eksterlaar terminus to the Herentalsebaan, where it joined the trajectory of route 24 to the Silsburg terminus at the Deurne-Wommelgem border. On May 2, 2012, the line was shortened from the Bolivarplaats to the Groenplaats, due to construction works in the Nationalestraat.

On September 1, 2012, tram route 8 was suspended, and its trajectory was added to tram route 4 (formerly Hoboken-Sint-Pietersvliet). However, due to ongoing construction works at the Nationalestraat, it was temporarily impossible to join the trajectory with the original tram route 4, which was also shortened to the Marnixplaats. On February 9, 2013, the two parts of route 4 were connected to each other via a deviation over the Leien. On March 30, 2013, after the works in the Nationalestraat had finished, tram route 4 was able to start service on its definitive trajectory Hoboken-Silsburg. The colors of route 8, black text on an orange background, were transferred with the closing of the route on September 1 to a new tram route 9, running between the Eksterlaar terminus and Linkeroever P+R using the premetro network.

Present day route

Works on the eastern premetro tunnel under the Carnotstraat and Turnhoutsebaan started in 1977, and were planned to open a few years later. After 5 years of tunneling and construction works, structural works on the tunnel and stations were largely finished, however, due to austerity measures imposed in the 1980s by the successive Martens governments, and the transfer of authority to the Flemish government after state reforms, construction on the premetro network was put to a halt. Although the extension of the central premetro axis to Linkeroever, and the construction of the northern premetro axis to the Sportpaleis were finished in the 1990s, no initiative was taken to open the eastern premetro axis until recently. The creation of route 8 and the opening of the eastern "Reuzenpijp" premetro tunnel were a part of the 2020 mobility masterplan as the LIVAN project.

Originally, also another trajectory was considered in which the new route 8 would follow the trajectory of route 24 all the way to the Silsburg terminus, and would then turn north to the Wommelgem P+R either parallel to, or over the R11 road, in the first case going under the E313/E34 highway in a newly constructed tunnel. However, this plan was not adopted, and finally, it was decided to separate route 8 from route 24 near the AZ Monica hospital, after which route 8 would go north over the Ruggeveldlaan, passing under the E313/E34 using the already present bridge over the Ruggveldlaan. The route then turns east and uses a newly built "tram antenna" through the Rivierenhof park toward its destination. Also included in the LIVAN project was the construction of further tram tracks at the Ruggeveldlaan. These tracks, connecting the Herentalsebaan and Turnhoutsebaan, are currently only used as a technical track to the tram depot in Wijnegem. However, plans exist for the creation of a new north-south tram route making use of the tracks, replacing bus route 19.

The present day route 8 was officially opened on April 18, 2015 between the Astrid premetro station and the newly built Wommelgem P+R.

Future

When the premetro entrance at the Frankrijklei will be finished in summer 2017, route 8 will, according to plan, be extended to the Schoonselhof, via the Opera premetro station and then, after leaving the premetro, following the same trajectory as the above ground route 24. The trams will stop in Opera station at level -3, using new platforms perpendicular the ones now being used by routes 3,5,9 and 15, after it will be opened in September 2018.

As of 2018, route 8 will be joined in the premetro tunnel under the Turnhoutsebaan by route 10, after another metro entrance at the Foorplein will be opened. Construction works have started in 2017 and should take 9 months.

In the far future, route 8 could further be extended from Wommelgem to the Q8-highway station Ranst, however, no concrete plans exist up to this date.

Rolling stock

Service on the previous route 8, suspended in 2012, was provided mainly by coupled PCC cars and HermeLijn trams.

Service on the present day route 8 is mainly provided by single PCC cars. The premetro tunnel between Astrid and Muggenberg is the first tunnel in the premetro network to receive a new security system, and most HermeLIjn trams are currently not yet equipped with this system. Converted HermeLijn trams can sporadically be seen on the route. The new Albatros Flexity 2 trams are also equipped with the system, but are at present not used on route 8.

References

Tram route 8 (Antwerp) Wikipedia


Similar TopicsKarunam
Sint
Bill Page