Tram route 6 (Antwerp)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
tram

Stations
  
24

Locale
  
Antwerp

System
  
Antwerp tram network

Opened
  
October 27, 2007

Tram route 6 (Antwerp)

Termini
  
Luchtbal Metropolis P+R Olympiade P+R

Color on map
  
white text on dark pink background

Tram route 6 is a tram route in Antwerp between the Metropolis P+R in the northern Luchtbal suburb and the Olympiade P+R in the southern Kiel neighborhood, using the pre-metro network between stations Sport and Plantin. The route was officially opened on October 27, 2007 and is operated by the Flemish transport company De Lijn.

Contents

Trajectory

Tram route 6 begins at the Metropolis P+R next to the Metropolis cinema complex in the southern part of the Luchtbal suburb. The route then uses the Groenendaallaan and Delbekelaan, before arriving at the Gabriel Theunis bridge over the Albert canal. After crossing the canal, the route enters the pre-metro network, which it uses between Sport to the north and Plantin to the south. After coming above ground near the Charlottalei, it follows the Belgielei to the Harmonie park, and then the Jan van Rijswijcklaan to its terminus Olympiade in the Kiel neighborhood.

Because of the large underground portion of the route, it is presented by De Lijn as a rapid tram route. Also, it is known and promoted as an "event route", because it connects various event hubs in the city, like the Metropolis cinema, the sportpaleis stadion, Antwerp Central Station, the Antwerp zoo and Aquatopia, the UGC cinema, the Koningin Elisabethzaal, the diamond museum, the deSingel art centre and Antwerp Expo, where fairs are regularly held (most notably the annual Antwerp book fair).

Historical route (-1938)

The original tram route 6, also known as the "port route", ran between the Stuivenberg hospital and the present day Bolivarplaats (at the time, still the site of Antwerp-Zuid station), using the Lange Beeldekensstraat, Diepestraat, Brouwersvliet to the quays at the river Scheldt, and then following the quays all the way to its southern terminus. In 1938, the tram route was replaced by a trolleybus route, having a depot in the Somméstraat. On March 30, 1964, this trolleybus route itself was replaced by a regular bus route. The original trajectory is now a part of circular bus route 30/34 (depending on the direction of travel).

Present day route (2007-present)

On Saturday the 27th of October 2007, a new tram route 6 was opened, functioning as a new north-south connection through the pre-metro network, where previously, all pre-metro lines ran between Linkeroever in the west, and either northern or southern Antwerp. Although the route added some new parts to the operational tram network in Antwerp, no new tracks or tunnels had to be built. The largest part of the trams route, between the Gasthuishoeve stop and Astrid, and between Diamant and the Olympiade terminus, were already being used by tram routes 2,3 (and partially 5 and 15). The part between the Metropolis terminus and the Gasthuishoeve stop was not in use by a regular tram route before the opening of route 6, but was already built, and was used by trams when going to, or coming from the" Punt aan de Lijn" depot next to the Metropolis complex. The small part of the pre-metro network between Astrid and Diamant stations, part of a railway triangle, was also already present, but was until then only used by trams when not in service. Also the turning loop at the Olympiade was already present. This meant that only small works had to be done at the stops to enable service on route 6. After its opening, further works have been executed at the Metropolis and Olympiade turning loops.

Future

During the construction works concerning the elevation of the Gabriel Theunis bridge over the Albert Canal, tram traffic between Merksem and the Sportpaleis will not be possible. The elevation of the bridge to a height of 9,1m is necessary to allow bigger ships on the canal, as a part of a general program to increase the share of water transport and lower that of road cargo transport in the congested Antwerp region. However, the works have been delayed, and the start date of the works, originally planned to begin in 2014, is still uncertain. According to the present information, financing for the project would be started in 2016, and works should be finished in late 2018.

According to the Masterplan 2020, the route will be extended to the newly built Havana P+R in the northern part of the Luchtbal suburb in March 2017, using new tram tracks on the renewed Noorderlaan. In 2019, route 6 should be joined by a new tram route 1, between Metropolis and the Havana site, replacing bus route 23. On November 5, 2016, the trams stopped using the old Metropolis turning loop, instead using a temporary loop at the nearby tram depot until the completion of the works. The extension of route 6 to the Havana P+R is a part of the larger Noorderlijn project, aimed at improving public transport in the northern parts of Antwerp, and also including the renewal and construction of tram tracks of the Frankrijklei and Italiëlei, the renewal of the Operaplein and tram extensions in the Eilandje neighborhood.

Also, plans are being studied to extend the route in the south to Wilrijk, and, via the Antwerp University Hospital (UZA), to the Drie Eikenstraat in Edegem.

Rolling stock

After its opening, tram route 6 was almost exclusively served by the more recent HermeLijn trams. After May 1, 2010, a lot of the Hermelijn trams were transferred to the busier routes 2, 8 and 11. At present, the line is serviced by both HermeLijn trams and PCC cars (single and coupled).

References

Tram route 6 (Antwerp) Wikipedia