392 feet (119 m)

Floors
  
34

Estimated completion
  
April 2017

Number of units
  
314

Status
  
Topped-out

Cost
  
$75,000,000

Floor count
  
34

Architecture firm
  
MG2

Groundbreaking
  
27 March 2015

Tower 12 d1xchyov513y0icloudfrontnetwpcontentuploads0

Address
  
2015 2nd Avenue; Seattle, Washington

Similar
  
Madison Centre, 2nd & Pine, The Mark, Potala Tower, Doppler

Tower 12 is an under-construction apartment building in Seattle, Washington. The 34-story, 392-foot-tall (119 m) skyscraper will open in May 2017 and have 314 apartments as well as 7,000 square feet (650 m2) of ground-level retail space. It is located at the northwest corner of 2nd Avenue and Virginia Street near Pike Place Market and Victor Steinbrueck Park at the southwestern edge of the Belltown neighborhood.

Tower 12 Continental Properties39 Tower 12 Beginning to Rise SkyriseCities

The project's name, Tower 12, is a reference to the "12th man", a nickname for fans of the Seattle Seahawks football team.

Tower 12 Continental Properties39 Tower 12 Beginning to Rise SkyriseCities

History

Tower 12 Top 10 Seattle developments on BuzzBuzzHome in April 2016

The 2nd & Virginia site was formerly proposed as part of a $67 million condominium project in the early 1990s called "One Pacific Towers", which would have had two 27-story towers with 145 units in each, that was later cancelled. In 2008, developer Justen Company submitted proposals to build a 39-story, 234-unit condominium building on the same site, part of a two-tower project spanning Virginia Street, but did not move further on into the design review process.

Tower 12 Tower 12 Wikipedia

Bellevue-based developer Continental Properties bought the quarter-block property and master-use permit in March 2014 for $16 million, and announced plans to build a 324-unit residential building on the site using the previously-approved master-use permit. Initially planning to build condominiums, Continental instead opted to build apartments (later named "Tower 12") because of the higher value and lower risk involved.

Tower 12 Tower 12 Seattle Condos and Lofts

Construction of the building began on March 27, 2015 and is scheduled to be completed by April 2017. The building was topped out in August 2016.