Rahul Sharma (Editor)

Tehran Metro Line 3

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Rapid transit

Stations
  
22 (26 when complete)

System
  
Tehran Metro

Opened
  
December 16, 2012

Tehran Metro Line 3

Locale
  
Tehran, Tehran Province

Termini
  
Ghaem Station Azadegan Station

Tehran Metro Line 3 travels from northeast to southwest. Line 3 is one of the most important lines as it connects southwest Tehran to northeast, crosses busy parts of the capital city, and can help to alleviate traffic problems. About 7 kilometers (4.3 mi) of Line 3 became operational in December 2012, followed by 12 kilometers (7.5 mi) in April 2014, and finally, the last section of the line which is 18 kilometers (11 mi) opened on September 22, 2015, increasing the length of the line to a total of 37 kilometers (23 mi).

Route

The line starts from northeastern Tehran at Shahrak-e Qa'em going westward parallel to but 300 m north of Artesh Expressway, passing through Aghdasieh neighbourhood. Then it turns south at the end of Artesh Expressway going to Nobonyad Square. It then turns towards Sayyad Expressway and runs southward along it for about 5.6 kilometers (3.5 mi). At Sabalan square, it then turns west, going under Beheshti Street, intersecting with Line 1 at Shahid Beheshti Station. It then turns towards south, going under Valiasr Street for 7.7 kilometers (4.8 mi), until it reaches Rahahan Square, providing access to Tehran railway station. It then turns towards southwest, passing through Javadiyeh and then going along Cheraghi Expressway and Saidi Expressway. The line then terminates at Azadegan Station at the intersection of Saidi Expressway with Azadegan Expressway.

References

Tehran Metro Line 3 Wikipedia


Similar Topics