Samiksha Jaiswal (Editor)

Tarrytown (Metro North station)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Line(s)
  
Hudson Line

Parking
  
909 Spaces

Opened
  
1890

Tracks
  
4

Disabled access
  
Yes

Platforms in use
  
1

Tarrytown (Metro-North station)

Location
  
1 Depot Plaza Tarrytown, NY, 10591

Connections
  
Bee-Line Bus System: 1T, 13 Tappan ZEExpress

Address
  
Tarrytown, NY 10591, United States

Similar
  
Philipse Manor, New Hamburg, Ossining, Beacon, Irvington

The Tarrytown Metro-North Railroad station serves residents of Tarrytown, New York and other commuters via the Hudson Line and is one of four express stations on that line south of Croton–Harmon seeing most trains minus peak hour trains to/from Poughkeepsie. Trains leave for New York City every 25 to 35 minutes on weekdays. It is 24.5 miles (39.4 km) from Grand Central Terminal and travel time to Grand Central is about 44 minutes (35 minutes express).

Contents

The Tappan Zee Bridge is not far from the station, so the station sees some use by commuters from Rockland County. As of August 2006, daily commuter ridership was 2677 and there are 909 parking spots, fewer than 100 of which are owned by the railroad. Historically, the New York Central Railroad offered intercity service to Chicago along the Water Level Route, from the station. Amtrak does not offer this service. The closest station long distance passenger service is Yonkers.

Station building

The Tarrytown station was first used by commuters in 1890. The original station building, which also served as the terminus of John D. Rockefeller's private telegraph wire to his home in Pocantico Hills, was destroyed in a fire caused by a cigarette in April 1922. Plans for a new station were completed three years later in October 1925.

Almost 120 years after the station first went into use, an announcement was made in November 2007 concerning a large scale refurbishment of the station as part of the second phase of MTA's Capital Program. The renovated building will include a ticket agent and waiting area, new heated overpasses, stairways and elevators as well as new platforms. Metro-North has set aside $3.5 million for the project with the expectation that design work would be completed by the second quarter of 2008. Work at the Tarrytown station began in October 2009 and Metro North reports this federal stimulus project is expected to be finished by 2012.

Parking

The station has several parking options.

Connections

The station is currently served by a number of bus lines, including the Westchester Bee-Line, Tappan Zee Express as well as a number of other connections. Historically, the station was connected to other Westchester County communities via a trolley.

Station layout

The station has two slightly offset high-level platforms, each 10 cars long.

References

Tarrytown (Metro-North station) Wikipedia


Similar Topics