Kalpana Kalpana (Editor)

Surabaya–Mojokerto Toll Road

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Length
  
36.27 km

Major cities
  
East end:
  
Surabaya–Porong Toll RoadWaru–Juanda Toll Road

East end
  
Surabaya–Porong Toll Road; Waru–Juanda Toll Road

Surabaya–Mojokerto Toll Road (Sumo Toll Road, Indonesian: Jalan Tol Surabaya-Mojokerto) is a part of Trans-Java toll road that length of the toll road is 36.1 kilometres. This toll road connects the city of Surabaya (largest city in East Java) and Mojokerto Regency, in the west this toll road will be connected with Kertosono–Mojokerto Toll Road. The construction of this toll road began in 2007. Today, parts of the toll that has been operating is the 2.3-kilometre section IA (Waru–Sepanjang, inaugurated 27 August 2011) as well as the 18.47-kilometre section IV (Krian–Mojokerto, inaugurated 19 March 2016). While sections IB 4.3 km (Sepanjang-WRR), II 5.1 km (WRR-Driyorejo), and III 6.1 km (Driyorejo–Krian) are planned to be fully operational in 2017.

The planned exits on the Surabaya-Mojokerto toll are Waru, Sepanjang, WORR, Driyorejo, Krian, and Mojokerto.

References

Surabaya–Mojokerto Toll Road Wikipedia


Similar Topics