Samiksha Jaiswal (Editor)

Stateline Wind Farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Owner(s)
  
Florida Power & Light

Construction began
  
2001

Status
  
Operational

Make and model
  
Vestas

Stateline Wind Farm httpsuploadwikimediaorgwikipediacommonsthu

Location
  
Vansycle Ridge, Umatilla County, Oregon, and Walla Walla County, Washington

Commission date
  
2001 (Stateline 1) 2002 (Stateline 2) 2009 (Stateline 3)

Hub height
  
164 and 207 feet (50 and 63 m)

Stateline wind farm project


The Stateline Wind Farm is a wind farm located on Vansycle Ridge, which receives 16 to 18 mph (26 – 29 km/h) average wind speeds from the Columbia Gorge, on the border between Washington and Oregon in the United States. With 186 turbines currently operating in both states and 279 more approved for construction, it is the largest wind project in the Northwestern United States and will be the largest in the world. Costing $300 million to build, it began operation in 2001.

The project employs 660 kW capacity Vestas wind turbines, which collectively will produce a maximum electrical output of 306.9 MW. (The current operating capacity is 122.8 MW.) On average, the project is expected to produce 30 to 35 percent of that capacity year-round. Turbines are controlled individually by electronic systems which direct them into the wind and adjust the pitch of the blades to maximize electrical production at any wind speed from 7 to 56 mph. The turbines automatically shut down at wind speeds excess of 56 mph, a feature which allows them to withstand hurricane-force winds.

The wind turbines are grouped in strings of 5 to 37 turbines, each turbine spaced approximately 250 feet (76 m) from the next, generally slightly downwind of the crest of ridges. Each turbine tower is 166 feet (50 m) tall, with blades 76 feet (23 m) wide.

Environmental impact studies determined that the site was not used extensively by birds or other species vulnerable to injury from turbines, and the turbine towers' construction, along with the use of underground power lines, was designed to minimize perching places for birds. The area around the project is used primarily for private farming, including dryland wheat farming and cattle grazing.

The Stateline Wind Project is several miles northwest of the Vansycle Wind Project in Umatilla County, Oregon. Both are owned and operated by Florida Power & Light.

A wind turbine collapsed over the weekend of November 2, 2013 on the Washington side of the Stateline Wind Project.