Supriya Ghosh (Editor)

St John's Quarter

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
OS grid reference
  
SJ8318898056

Region
  
North West

Sovereign state
  
United Kingdom

Metropolitan county
  
Greater Manchester

Metropolitan borough
  
City of Manchester

Country
  
England

Post town
  
MANCHESTER

Dialling code
  
0161

St John's Quarter wwwmanchesterconfidentialcoukAssets1IMG1899JPG

St John's is a proposed £1 bn development of a 6 hectare plot within central Manchester, England. The site is being developed by Manchester Quays Ltd (MQL), a partnership between Manchester City Council and Allied London.

Contents

Development

The development will see up to 2,500 homes, up to 600,000 sq ft of workspace, mostly aimed at creative industries, (80,000 sq ft of this via refurbishment of the Bonded Warehouse), up to 400,000 sq ft of leisure space, incorporating some of the existing entertainment and studio buildings. The development will be on the former site of Granada Studios but it will extend as far as the Museum of Science and Industry and the Marriott Hotel on Water Street.

SimpsonHaugh and Partners are behind the masterplan which will also see two fifty storey towers and three hotels, including the Grande Hotel incorporating the iconic red neon 'Granada TV' sign.

The Factory

The development will feature a new £110 million theatre and arts venue called The Factory. Its name comes from Factory Records, the independent record label founded by the late Tony Wilson. The flexible space will provide a permanent home to the Manchester International Festival.

The £9.5m design contracts were put out to tender in July 2015. The successful company named by the council in November 2015 was the Office for Metropolitan Architecture (OMA) with its lead designer Rem Koolhaas.

The entire space will cover 13,000 square meters and will be flexible enough to accommodate combined audiences of up to 7,000, although it is envisaged that it will operate mainly as a 1,600 seat theatre space plus a 5,000 capacity warehouse space.

The opening ceremony is planned for the end of 2019.

References

St John's Quarter Wikipedia