Správa železniční dopravní cesty

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
state-owned company

Revenue
  
CZK 7.0 billion (2010)

Headquarters
  
Prague, Czech Republic

Area served
  
Czech Republic

Founded
  
1 January 2003

Správa železniční dopravní cesty wwwszdcczpromediamaterialykestazenilogoba

Industry
  
Infrastructure & Tracks Proprietor, State Administrator

Net income
  
CZK -1.5 billion (2010)

Total assets
  
CZK 91.4 billion (2010)

Správa železniční dopravní cesty (English: Railway Infrastructure Administration) is the national railway infrastructure manager in the Czech Republic. Its main customers include passenger train operator České dráhy and its cargo subsidiary ČD Cargo. SŽDC was founded with the restructuring of ČD from 1 January 2003, but until 2008 much of the operations, maintenance and renewals was contracted back to ČD. SŽDC manage 9,478 km of tracks in the Czech Republic - all main lines and almost all regional lines (except Nová Bystřice - Obrataň narrow gauge line and Šumperk - Kouty nad Desnou line).

In August 2010, SŽDC was ordered to stop work on all infrastructure projects as part of broader government austerity measures, but in September 2010 works were revived for all projects whose contractors agreed to grant a discount against the tender price. In December 2010 the Minister of Transportation Vít Bárta proposed bringing it into a holding company alongside ČD to "make subsidies more transparent".

In 2010 the revenues from rail network usage reached only CZK 4.3 billion, not even sufficient to cover personal expenses amounting to CZK 4.6 billion. The key budget items allowing management and repairs of the rail network were therefore subsidies from the State Fund for Transport Infrastructure (CZK 8.2 billion) and from the state budget (CZK 1.8 billion). Moreover, SŽDC received CZK 15 billion for modernization of the rail network.

In 2012, SŽDC started its largest ever infrastructure project; a new railway line between Plzen and Rokycany, expected to cost 7.53 billion CZK (with 85% funding from the EU). It is expected to be completed in Spring 2015. The new railway would be 14·1 km long, with a 4·15 km twin-bore tunnel.

Priority projects

Priority projects for 2012-2015 are:

  • Reconstructing the station at Břeclav;
  • Improving the speed and capacity of the route between Bubeneč and Holešovice stations in Prague;
  • Modernising Olomouc main station;
  • Upgrading the railway line between Sudoměřice u Tábora and Tábor to allow higher speeds;
  • Moving the line through Ústí nad Orlicí whilst preserving the historic station building.
  • The European Union will provide most of the funding for these projects.

    References

    Správa železniční dopravní cesty Wikipedia