Status Operational Type Flat-panel PV Site area 133 ha Units operational 850000 | Commission date 3 December 2011 Nameplate capacity 67.805 MW Construction cost 100 million EUR | |
![]() | ||
Similar Eggebek Solar Park, Strasskirchen Solar Park, Bavaria Solarpark, Waldpolenz Solar Park, Erlasee Solar Park |
The Solarpark Alt Daber is a photovoltaic facility in Germany with 67.8 megawatts (MW, 90,900 hp). It was completed 3 December 2011, for a cost of €100 million, and is expected to produce 71 GWh/year. It is located on a former military airport.
In 2014 a prototype of a battery storage system was added, mainly to provide frequency-response.
References
Solarpark Alt Daber Wikipedia(Text) CC BY-SA