Samiksha Jaiswal (Editor)

Solarpark Alt Daber

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Germany

Status
  
Operational

Type
  
Flat-panel PV

Site area
  
133 ha

Units operational
  
850000

Location
  
Wittstock

Commission date
  
3 December 2011

Nameplate capacity
  
67.805 MW

Construction cost
  
100 million EUR

Solarpark Alt Daber

Similar
  
Eggebek Solar Park, Strasskirchen Solar Park, Bavaria Solarpark, Waldpolenz Solar Park, Erlasee Solar Park

The Solarpark Alt Daber is a photovoltaic facility in Germany with 67.8 megawatts (MW, 90,900 hp). It was completed 3 December 2011, for a cost of €100 million, and is expected to produce 71 GWh/year. It is located on a former military airport.

In 2014 a prototype of a battery storage system was added, mainly to provide frequency-response.

References

Solarpark Alt Daber Wikipedia