Suvarna Garge (Editor)

Shah wa Arus Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Opening date
  
2016

Impounds
  
Shakardara River

Height
  
75 m

Operator
  
Afghanistan

Type of dam
  
gravity

Width (base)
  
60 m (197 ft)

Construction cost
  
41 million USD

Construction began
  
2012

Shah wa Arus Dam

Location
  
Kabul Province, Afghanistan

Total capacity
  
180,000 m (146 acre·ft)

Similar
  
Band‑e Sardeh Dam, Chaki Wardak Dam, Darunta Dam, Dahla Dam, Naghlu Dam

The Shah wa Arus Dam is a 75m high concrete gravity dam under construction on the Shakardara River, located 22 km away from Kabul City, Afghanistan. The dam with a 60m wide three-bay spillway is mainly geared towards provision of irrigation water as well as flood control and reliable year-round water supply to the city of Kabul as well as the district of Shakardara. The bidding process deadline was on 24 March 2012 to build the Shah-wa-Arus irrigation and hydropower project, which includes a rockfill dam, intake, powerhouse, pickup weir with balancing reservoir and head regulators, and right and left side main canals. Tablieh and Parhoon Tarh JV Company was chosen as the main contractor for the project in a Design-Build contract in which the design services are provided by Alborz Sazeh Company.

Map of Shah wa Arus Dam, Afghanistan

President Karzai accompanied by ministers of water and energy Ismayel Khan and economy minister Abdul Hadi Arghandiwa, national Security Council advisor Dr. Rangeen Dadfar Spanta, Kabul Governor Ahmadullah Alizai and members of the National Assembly opened the construction work on the dam on 19 June 2012. The Dam will cost $41 million, with 81 meters height at the rocky base and about 330 000 cubic meters of concrete, would be the first Roller-compacted concrete (R.C.C) that will be implemented within 55 months. The dam will produce 1.2 Megawatts of power and irrigate 2700 hectares of land in addition to supplying drinking water for the residents of Kabul city. The project is an important scheme that will create jobs for 500 jobless Afghans during its completion process. The Project is located near the village of Nazim Khel on Shakardara River North West of Kabul Province.

The Shah-wa-Arus Multipurpose Dam Project has the following major components:

  • Roads, Bridges & other Infrastructure
  • Concrete Dam with Power Intake Structure
  • Power House
  • Pick up weir with Balancing Reservoir and Head Regulators
  • References

    Shah wa Arus Dam Wikipedia