Harman Patil (Editor)

SM UB 120

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
UB-120

Yard number
  
293

Launched
  
23 February 1918

Builder
  
AG Weser

Ordered
  
6/8 February 1917

Commissioned
  
23 March 1918

Draft
  
3.72 m

SM UB-120

Cost
  
3,654,000 German Papiermark

Fate
  
Surrendered 24 November 1918.

SM UB-120 was a German Type UB III submarine or U-boat in the German Imperial Navy (German: Kaiserliche Marine) during World War I. She was commissioned into the German Imperial Navy on 23 March 1918 as SM UB-120.

UB-120 was surrendered to the British on 24 November 1918 in accordance with the requirements of the Armistice with Germany. She was broken up in Swansea in 1922

Construction

She was built by AG Weser of Bremen and following just under a year of construction, launched at Bremen on 23 February 1918. UB-120 was commissioned later the same year under the command of Oblt.z.S. Richard Plum. Like all Type UB III submarines, UB-120 carried 10 torpedoes and was armed with a 8.8 cm (3.46 in) deck gun. UB-120 would carry a crew of up to 3 officer and 31 men and had a cruising range of 7,280 nautical miles (13,480 km; 8,380 mi). UB-120 had a displacement of 512 t (504 long tons) while surfaced and 643 t (633 long tons) when submerged. Her engines enabled her to travel at 13.9 knots (25.7 km/h; 16.0 mph) when surfaced and 7.6 knots (14.1 km/h; 8.7 mph) when submerged.

References

SM UB-120 Wikipedia