Ringhals Nuclear Power Plant

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Sweden

Capacity factor
  
79.3%

Construction began
  
1969

Phone
  
+46 340 66 70 00

Ringhals Nuclear Power Plant

Commission date
  
R1: January 1, 1976 R2: May 1, 1975 R3: September 9, 1981 R4: November 21, 1983

Operator(s)
  
Ringhals AB (Vattenfall 70.4%, Uniper SE 29.6%)

Units operational
  
R1: 855 MW R2: 866 MW R3: 1051 MW R4: 1120 MW

Address
  
Ringhals Kärnkraftverk, 432 85 Väröbacka, Sweden

Hours
  
Closing soon · 9AM–3PMThursday9AM–3PMFriday9AM–3PMSaturdayClosedSundayClosedMonday9AM–3PMTuesday9AM–3PMWednesday9AM–3PMSuggest an edit

Similar
  
Forsmark Nuclear Power Pl, Oskarshamn Nuclear Power Pl, R1, Olkiluoto Nuclear Power Pl, VVER

Cyclists entering ringhals nuclear power plant


Ringhals is a Swedish nuclear power plant with 4 reactors, one boiling water reactor (R1) and three pressurized water reactors (R2, R3 and R4). It is situated on the Värö Peninsula (Swedish: Väröhalvön) in Varberg Municipality approximately 60 km south of Gothenburg. With a total power rating of 3560 MWe, it is the largest power plant in Sweden and generates 24 TWh of electricity a year, the equivalent of 20% of the electrical power usage of Sweden. It is owned 70% by Vattenfall and 30% by Uniper SE.

Following a number of security breaches and incidents since 2005, the Swedish Radiation Safety Authority decided in 2009 to put Ringhals under increased surveillance. In 2012 a small amount of explosive was found underneath a truck at the plant.

In October 2012, 20 anti-nuclear Greenpeace activists scaled the outer perimeter fence, and there was also an incursion at Forsmark nuclear power plant. Greenpeace said that its non-violent actions were "intended to protest against the continuing operation of these reactors, which it argues were shown to be unsafe in European stress tests."

In April 2015, Vattenfall announced "Ringhals 1 and 2 may be closed down between the years 2018 and 2020 instead of, as previously announced, around 2025", due to the declining profitability of these units. Ringhals 3 and 4 are still expected to continue in service until the 2040s.

In January 2016, Vattenfall announced that all its Swedish nuclear power plants, including the newer reactors, were operating at a loss due to low electricity prices and Sweden's nuclear output tax. It warned that it may be forced to shut all the nuclear plants down, and argued that the nuclear output tax should be scrapped.