Country United States Status Active Phone +1 732-238-1462 Units operational 4 | Commission date 2002 Nameplate capacity 830 MW Owner The Carlyle Group | |
![]() | ||
Address 832 Red Oak Ln, Sayreville, NJ 08872, USA Similar Bergen Generating Station, Starland Ballroom, New Egypt Speedway, Laurita Winery, Field Station: Dinosaurs |
Red Oak is an 830-megawatt combined cycle gas turbine power plant located in Sayreville, New Jersey not far from the South River opened on 2002.
Energy Capital acquired it from a subsidiary of the AES Corporation in April 2012, which, in November 2013, sold it to the Carlyle Group.
Damage to the plant due to Hurricane Sandy in 2012 took it offline line for five months.
TAQA subsidiary TAQA Gen-X owns 85% and Morgan Stanley owns 15% of the tolling agreement for the facility through its with partner. Natural gas is provided by New Jersey Resources. It is part of the PJM Interconnection of the Eastern Interconnection grid electric transmission system. A 2013 report named It is one of the largest single sources of carbon pollution in the state.
The Sayreville Energy Center operated by NextEra Energy Resources is nearby.