Rahul Sharma (Editor)

Quadrant:MK

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Architecture firm
  
GMW Architects

Seating capacity
  
3,000 employees

Town or city
  
Milton Keynes

Construction started
  
2009

Main contractor
  
BAM

Opened
  
11 June 2012

Cost
  
108 million GBP

Quadrant:MK

Floor area
  
37,000 square metres (400,000 sq ft)

Similar
  
National Hockey Stadium, Milton Keynes Central ra, Central Milton Keynes S

The Quadrant:MK is the national centre for Network Rail, opened in June 2012. The complex, consisting of four linked buildings, is designed to accommodate 3,000 staff.

The complex, designed by architects GMW, is designed to provide 37,000 square metres (400,000 sq ft) of space.

The buildings built by Royal BAM Group are located on the site of the former England National Hockey Stadium, adjacent to Milton Keynes Central railway station.

References

Quadrant:MK Wikipedia