Seating capacity 3,000 employees Construction started 2009 | Main contractor BAM Opened 11 June 2012 Cost 108 million GBP | |
![]() | ||
Floor area 37,000 square metres (400,000 sq ft) Similar National Hockey Stadium, Milton Keynes Central ra, Central Milton Keynes S |
The Quadrant:MK is the national centre for Network Rail, opened in June 2012. The complex, consisting of four linked buildings, is designed to accommodate 3,000 staff.
The complex, designed by architects GMW, is designed to provide 37,000 square metres (400,000 sq ft) of space.
The buildings built by Royal BAM Group are located on the site of the former England National Hockey Stadium, adjacent to Milton Keynes Central railway station.
References
Quadrant:MK Wikipedia(Text) CC BY-SA